METRO MANILA SUBWAY KALAYAAN STATION ANG BGC STATION
SkywalkTv
0:00 / 0:00
METRO MANILA SUBWAY KALAYAAN STATION ANG BGC STATION
6 254 просмотра · 9 дней назад
SkywalkTv
54,5 тыс. подписчиков
6 254 просмотра · 9 дней назад
The Metro Manila Subway (MMSP) is the Philippines' first underground rapid transit line. It is a flagship infrastructure project designed to reduce traffic congestion and improve travel across Metro Manila.
Key facts
Length: Approximately 33 km
Stations: 17 stations
Type: Mostly underground, with a depot in Valenzuela
Operator: The Philippine government (through the Department of Transportation), with support from the Japan International Cooperation Agency (JICA)
Rolling stock: Japanese-designed metro trains
Planned route
The subway will connect:
Valenzuela
Quezon City
Ortigas (Pasig)
Bonifacio Global City (Taguig)
Ninoy Aquino International Airport (NAIA)
FTI (Taguig)
Major planned stations include:
East Valenzuela
Quirino Highway
Tandang Sora
North Avenue
Quezon Avenue
Anonas
Katipunan
Ortigas North
Ortigas South
Kalayaan Avenue
Bonifacio Global City
Senate–DepEd
NAIA Terminal 3
FTI
Travel benefits
Once fully operational, the subway is expected to:
Reduce travel time from Quezon City to NAIA to around 35 minutes.
Serve hundreds of thousands of passengers daily.
Connect with existing rail lines such as MRT-3, LRT-1, LRT-2, the North–South Commuter Railway, and the Metro Manila Skyway network through intermodal stations.
Current status (2026)
Construction is ongoing across multiple sections, including station excavation, tunnel boring, and depot works. The project has experienced delays compared with its original schedule, so the full line is not yet operational.