Stormwater Advanced Training Part 6: Workshop 1 - Evaluating Pre- and Post- Development Designs

Bentley Water Infrastructure

0:00 / 0:00

Stormwater Advanced Training Part 6: Workshop 1 - Evaluating Pre- and Post- Development Designs

5 246 просмотров · 5 л. назад
Bentley Water Infrastructure
19,4 тыс. подписчиков
5 246 просмотров · 5 л. назад
DATASET DOWNLOAD: (US) https://bentleysystems.service-now.co... (SI) https://bentleysystems.service-now.co... Applicable products: CivilStorm, SewerGEMS Applicable versions: CONNECT Edition In this exercise you will analyze the impact of a road expansion on existing farmland. You will review the existing situation, looking at the pre-development hydrograph for a 10-Yr storm. You will then complete the post-development scenario by entering the last catch basin for the new drainage system. You will use a terrain model file so the software can delineate the catchment that drains to the catch basin. You will analyze the post-development situation, and compare the pre- and post-development hydrographs. You will then design a storm water detention pond so that the post-development peak flow rate does not exceed the pre-development peak flow rate for the 10-Yr design storm. You will check that the detention pond does not overflow during a 100-Yr storm event. Part 6 of 13.