JPBX 920 Caltrain Lead Amtrak Capitol Corridor 525| New E-Bell* Robben Rd. Railroad Crossing Dixon C
MobileRailSpotterRxR
0:00 / 0:00
JPBX 920 Caltrain Lead Amtrak Capitol Corridor 525| New E-Bell* Robben Rd. Railroad Crossing Dixon C
1 157 просмотров · 1 дн. назад
MobileRailSpotterRxR
168 тыс. подписчиков
1 157 просмотров · 1 дн. назад
Oct 20, 2026
As winter is getting closer, night time was starting later in the morning so I started in the dark this day here. Since I last filmed here, the close MEG Electronic Bell replaced the previous one that had died.
Caltrain leads Amtrak California Capitol Corridor Train 525 westbound on the UP Martinez Sub passes through the Robben Road railroad crossing in Dixon, California. No need for a before link since it's the same type of bell.
JPBX 920
-Amtrak Capitol Corridor Train #525
Crossing Info
City: Dixon, California
Crossing Signal/Line Owner: Union Pacific Railroad
Crossing User(s): AMTK, UPRR
Bell Sequence: Ring through whole activation
Filmed Side: Southern Side
Right Signal - Safetran 80s Cantilever
Bell: NEG E-Bell *New*
Lights: 3 pairs = Mast - 1 pair of 12x24 inch Electro-Tech LEDs/Safetran Lights (Hawker Siddley Era), Overhead - 1 12x24 inch Harmon Dotted LEDs/Safetran Light (Hawker Siddley Era), 1 12x24 inch WCH 2nd Gen Miller Felpax LEDs/Safetran Light (Hawker Siddley Era), & 2 12x24 inch Electro-Tech LEDs/Safetran Lights (Hawker Siddley Era)
Junction Boxes: Safetran
Cantilever Install: SP early 1990s, Installed between 1992 - 1994
Gated Mast
Lights: 1 pair of 12x24 inch WCH 2nd Gen Miller Felpax LEDs/Safetran Lights
Junction Box: Safetran
Gate Lights: NEG Clear Gate LEDs "Alstom-Aurora Style"
Mechanism/Counterweight Arm: Siemens
Base: Siemens
Gate Mast Install: UP early 2020s, Installed 2020
Left Signal - Safetran 80s Cantilever
Bell: NEG E-Bell
Lights: 3 pairs of 12x24 inch Electro-Tech LEDs/Safetran Lights (Hawker Siddley Era)
Junction Boxes: Safetran
Cantilever Install: SP early 1990s, Installed between 1992 - 1994
Gated Mast
Lights: 1 pair of 12x24 inch WCH 2nd Gen Miller Felpax LEDs/Safetran Lights
Junction Box: Safetran
Gate Lights: NEG Clear Gate LEDs "Alstom-Aurora Style"
Mechanism/Counterweight Arm: Siemens
Base: Siemens
Gate Mast Install: UP early 2020s, Installed 2020
This crossing owned by the Union Pacific Railroad is an mixed signal install with the cantilevers being an SP late 1980s to early 1990s signal install with its bells and lights changed overtime. The gated masts are UP early 2020s signal installs.
Camera
Sony FX30 Cinema Line + Tamron 17mm - 300mm
Camera
DJI Osmo Pocket 4P (4 Pro) + Wide Angle