1 Hour of China’s Bullet Train Density Outside Guangzhou South
江霍尧Jianghuoyao
0:00 / 0:00
1 Hour of China’s Bullet Train Density Outside Guangzhou South
3 341 просмотр · 1 дн. назад
江霍尧Jianghuoyao
331 подписчик
3 341 просмотр · 1 дн. назад
Road to 1,000 subs! If you enjoy Chinese high-speed rail content, subscribe to support an independent creator. Thanks!
Trainspotting for about an hour at Sanshan Forest Park in Foshan, just 6 km northwest of Guangzhou South Railway Station.
This spot sits right where the Beijing-Guangzhou, Nanning-Guangzhou and Guiyang-Guangzhou high-speed lines come together. Because of the heavy traffic into the station, trains regularly slow down, queue up and pass each other.
Train models in this video:
• CR400 Fuxing (16-car sets and 8+8 coupled formations)
• CR300AF (in the official "Sea-Sky Blue" Fuxing livery, nicknamed "Blue Sister")
• CRH380A / CRH380B (long formations and coupled sets)
• CRH3C (showing quite a bit of yellow rail grime from long-distance running)
• CRH1E sleeper (16-car overnight train, Shanghai Bureau, Foshan West → Shanghai Hongqiao)
• CRH1A & CRH2A (including coupled CRH1A sets on regional services)
Location:
• Hilltop of Sanshan Forest Park, Nanhai District, Foshan
• About 6 km straight-line to Guangzhou South (8–10 km by rail)
• Roughly 7–8 km from Jiahui Plaza, where you can see stacked multi-level tracks
• Guangzhou South to Jiahui Plaza is about 14–16 km by road
If you enjoy Chinese high-speed rail and rolling stock variety, feel free to subscribe for more.
0:00 Intro
0:23 Sanshan Forest Park
1:01 Reaching the Hilltop
1:25 Meet: Long-Formation CRH380A & 8-car CRH1A
2:07 CR400 Meet
2:45 16-car Long CRH2A
3:00 CRH1E Sleeper Train
3:33 Meet: Coupled CRH1A & CR300AF
4:00 The CRH380B & CRH3C: Can You Even Tell Them Apart?
4:43 Meet: Long-Formation CRH380A & Coupled CRH1A
5:50 Fuxing Train Crawling for Dispatch Signals
6:12 Triple Train Meet
6:40 Parallel Run (The Thumbnail Shot)
7:34 Smart Fuxing Leaning into the Curve
8:33 CRH380A "In Time-out" Waiting for Dispatch
9:05 Meet: Coupled CRH1A & CRH2A
9:47 Yet Another Triple Meet
10:10 A Clean CRH3C & a CRH380B
10:35 4-Train Intercity Meet (CRH6A)
10:48 Transfer at Fangcun Metro Station Exit H
11:00 Ground-Level View under the Stacked Tracks
11:11 Crazy Dirty CRH3C
11:28 Fuxing Blasting through at 245–280 km/h
11:46 Coupled Smart Fuxing CR400AF-Z
12:00 Meet: CRH3C & Smart CR400BF
12:35 Another Dirty CRH3C on the Nanning Line
12:52 Thanks for Watching!
#BulletTrain #HighSpeedRail #ChinaHSR #TrainDensity #GuangzhouSouth #ChineseTrains #Railfanning #BulletTrainDensity #ChinaRail #HighSpeedTrain #Railway #TrainsOfChina #Guangzhou