MTA LIRR Train 557: C3 🍀Oyster Bay Branch🍀 Train [Oyster Bay to Jamaica]
the _elmeister
0:00 / 0:00
MTA LIRR Train 557: C3 🍀Oyster Bay Branch🍀 Train [Oyster Bay to Jamaica]
1 019 просмотров · 2 нед. назад
the _elmeister
9,77 тыс. подписчиков
1 019 просмотров · 2 нед. назад
OBY Train #557 to Jamaica stop timestamps:
0:00 — Oyster Bay [Eastern Terminal ◾️]
13:04 — Locust Valley
16:25 — Glen Cove
18:52 — Glen St
21:26 — Sea Cliff
24:59 — Glen Head
28:04 — Greenvale
32:30 — Roslyn
35:33 — Albertson
38:21 — East Williston
Oyster Bay Branch
••••••••••••••••••••••••••••••••••••••••••••••••••••
Main Line
41:56 — Mineola [Transfers: PJN and RON Line Trains]
47:07 — Merillon Av (Skipped 🚫)
48:02 — New Hyde Park (Skipped 🚫)
49:06 — Floral Park (Skipped 🚫)
49:42 — Bellerose (Skipped 🚫)
50:10 — Elmont-UBS Arena (Skipped 🚫)
NASSAU COUNTY
———————————————————————————
QUEENS
50:49 — Queens Village (Skipped 🚫)
52:16 — Hollis (Skipped 🚫)
55:59 — Jamaica [Transfers: PJN, LBH, WHD, HEM, FRY, RON, BTA, MTK, CYL Line Trains; Connections: (E) (J) Trains, AirTrain to JFK and Q44 SBS] [Western Terminal ◾️]
Car Model and Number: Kawasaki C3 #5013
Departure Track: 1
Arrival Track: 3
Taken on: Monday, August 24, 2026
After stringing together a peaceful midday on the island right before a two week break, the mindset was full of surprises over the next several weeks. With suspensions in effect on the (L) Line for the remainder of my time before the trip, I took this opportunity and what a wonderful decision. Sadly, I would only have enough time to cover a late midday pair of roundtrips on the 42 St (S) on the day I left to Ponta Delgada for two weeks. This was because there was so much to pack for this long break and it was gonna be a trip to remember. However, in the month of September, I will be covering a lot of things and it will compliment with my role of potentially joining the alumni committee with Tech Unlimited. Not only that, but I found out recently at the time I am uploading this that the (7) {7} Line is starting its final phase of renovation in the next week or two. The resumption of regular (7) {7} Train service should be back by April or May 2027. I’ll talk more about the effects of the (7) {7} Line and 42 St when I cover the 42 St (S) for 2026. Until then, I hope you viewers enjoy this journey through the valley and the suburbs before a great workout.