Перейти к содержимому

Swiss Chalet Construction Animation – Part 2: Foundation Works (Excavation to Concrete Pour)

Gridline BIM

0:00 / 0:00

Swiss Chalet Construction Animation – Part 2: Foundation Works (Excavation to Concrete Pour)

3 просмотра · 22 ч назад
Gridline BIM
18 подписчиков
3 просмотра · 22 ч назад
The full foundation sequence of the Swiss chalet, step by step: excavation and trucking away the spoil, compaction, hardcore, blinding and DPM, raft rebar to the foundation plan (T12 @ 200 c/c, two mats, chairs and cover blocks) with a spacing check, starter bars for walls and columns, formwork with stakes, props and spacers, and the concrete pour with mixer and pump. This animation goes with Part 2 of the Swiss Chalet Project (Foundation). Revit lesson for this part:    • Swiss Chalet in Revit – Part 2: Foundation...   Tricks video for this part:    • 2 Revit Tricks for the Foundation: Hide Gr...   Previous animation (Part 1, site preparation):    • Swiss Chalet Construction Animation – Part...   Series intro:    • Swiss Chalet Project – Series Intro: One C...   Subscribe to Gridline BIM so you don't miss the next part:    / @gridlinebim   Estimating with Excel or Bluebeam? Visit our sister channel Gridline Estimating:    / @gridlineestimating   License: Creative Commons Attribution (CC BY). You may reuse this video with credit to Gridline BIM. #Construction #Foundation #Rebar #SwissChalet