MK-1 Cylinder Lubricating Pump Assembly, Step by Step | Glyd-Ring at 80 °C, 90 bar Pressure Test
Enginemaster
0:00 / 0:00
MK-1 Cylinder Lubricating Pump Assembly, Step by Step | Glyd-Ring at 80 °C, 90 bar Pressure Test
34 просмотра · 9 дн. назад
Enginemaster
86 подписчиков
34 просмотра · 9 дн. назад
How to assemble a Wärtsilä cylinder lubricating pump in 33 steps: cleaning, bore scope and burr checks, KOENIG sealing plugs, the feed rate spacer (40 Nm), injection pistons, casing onto base, crosswise cap screws, check valves (6 Nm), the main piston spring, the cover sleeve, fitting the glyd-ring at 80 °C with the right assembling bush, the control piston function check, and the over pressure test at 90 bar for 5 minutes on an electric test bench. It finishes with the solenoid valve and the pressure transmitter.
For each step you get what to do, which tool to use and why, and how to prove the pump is good before it goes back on the engine. The figures are traced and colourised from the workshop photos.
This video is for training only. It is not an official procedure from the pump or engine maker, so always follow the maker's instruction book and your own safety management system.
Chapters:
0:00 Intro
0:27 Route and kit
1:14 Step 1: Cleaning
1:42 Steps 2–4: Bore scope and burr check
2:13 Steps 5–9: KOENIG sealing plugs
2:44 Step 10: Adjustment screw O-ring
3:04 Step 11: Feed rate spacer
3:27 Step 12: Mark casing and base
3:48 Step 13: Injection pistons
4:07 Step 14: O-ring in casing
4:23 Step 15: Casing onto base
4:37 Step 16: Main piston
4:53 Step 17: Secure the main spool
5:11 Step 18: Cap screws, crosswise
5:37 Step 19: Check valves
5:57 Step 20: Mark the main piston
6:12 Step 21: Main piston spring
6:29 Step 22: Cover sleeve
6:47 Step 23: Glyd-ring at 80 °C
7:16 Step 24: Insert control piston
7:27 Step 25: Cover O-rings
7:39 Step 26: Fit the cover
7:58 Step 27: Control piston function
8:22 Over pressure test – safety
8:35 Step 28: Plug the outlets
8:56 Step 29: Fill and connect the test block
9:16 Step 30: 90 bar for 5 minutes
9:44 Steps 31–32: External elements
9:54 Step 33: Pressure transmitter
10:19 Recap
#Wartsila #CylinderLubrication #MarineEngineering #EngineRoom #PumpOverhaul #EngineMaster