Diverting Former Lim Chu Kang Road to Realigned Lim Chu Kang Road
Ethan777
0:00 / 0:00
Diverting Former Lim Chu Kang Road to Realigned Lim Chu Kang Road
3 375 просмотров · 1 год назад
Ethan777
856 подписчиков
3 375 просмотров · 1 год назад
On 8 June 2025, at 0118hrs, the realigned Lim Chu Kang Road was open to the public after a 48 mins delay from the original timing.
Traffic Police and the DE159 Civil Contractors, worked instantly to shift the water-filled barriers and re-position the cones to guide vehicles into the realigned road within a short span of time whilst allowing the last trickle of vehicles to drive out from the former Lim Chu Kang Road.