EXCLUSIVE VISIT TO ECRL DEPOT! 🇲🇾🚆 East Coast Rail Link (ECRL) Section 10 Tracklaying Base Kuantan
RailTravel Station
0:00 / 0:00
EXCLUSIVE VISIT TO ECRL DEPOT! 🇲🇾🚆 East Coast Rail Link (ECRL) Section 10 Tracklaying Base Kuantan
13 678 просмотров · 1 год назад
RailTravel Station
9,77 тыс. подписчиков
13 678 просмотров · 1 год назад
Step inside the East Coast Rail Link (ECRL) Section 10 Tracklaying Base in Kuantan for a rare look at Malaysia’s game-changing railway! 🚆🇲🇾 This Malayan Railway Fan Club visit was made possible with thanks to Malaysia Rail Link (MRL) and East Coast Rail Link (ECRL).
The East Coast Rail Link (ECRL) (东海岸衔接铁道) is a major infrastructure project currently under construction in Peninsular Malaysia. ECRL is a standard-gauge, single-track electrified railway designed to connect Port Klang on the west coast to Kota Bharu on the east coast, traversing the East Coast Economic Region states of Selangor, Pahang, Terengganu, and Kelantan, facilitating easier movement of people and goods between the east and west coasts of Peninsular Malaysia. The total planned length of the ECRL railway is approximately 665 kilometers. At speeds of passenger trains up to 160km/h, the ECRL will significantly cut travel time from Kota Bharu to ITT Gombak (Kuala Lumpur) to approximately 4 hours.
The ECRL is the largest economic cooperation project between Malaysia and China, with China Communications Construction Company (CCCC) serving as the main contractor. It is a flagship project under China’s Belt and Road Initiative (BRI), aiming to strengthen regional connectivity and economic integration in Southeast Asia.
🚆 East Coast Rail Link (ECRL) Info: https://railtravelstation.com/east-co...
🚆 More journeys: https://railtravelstation.com/ / railtravelstation
Please like, share, and subscribe to support this channel. Thank you!
Join the RailTravel Station YouTube membership for exclusive perks and content!
As a member, you'll get:
🚆 Early access to new videos
🚆 Special badges and emojis
🚆 Member-priority replies
🔔 Join here: / @railtravel_station
Support the channel and be part of our inner circle of rail enthusiasts!
00:00 East Coast Rail Link (ECRL) Section 10 Tracklaying Base
00:36 Welcome Presentation
00:46 ECRL Map
00:56 ECRL Progress Overall Achievements
01:06 ECRL Kota Bharu Railway Station Design
01:16 ECRL Kuala Terengganu Railway Station Design
01:28 ECRL KotaSAS Railway Station Design
01:57 ECRL ITT Gombak Railway Station Design
02:30 Other ECRL Typical Railway Stations Design
02:45 ECRL Section 10 Tracklaying Base Facilities
02:55 ECRL Fuxing CR200J EMU (复兴号CR200J型动车组)
03:48 ECRL HXD3C Electric Locomotive (和谐3C型电力机车)
04:25 ECRL DF8B Diesel Locomotive (东风8B型内燃机车)
04:58 ECRL Wagons
05:13 MRL x MRFC Gift Exchange
05:30 Adjourn to Construction Railway Operation Control Centre (CROCC)
06:59 Construction Railway Operation Control Centre (CROCC)
12:31 Section 10 Site
12:45 ECRL GC-270 Track Motor Vehicle
13:11 ECRL SPZ-200 Ballast Regulator Machine
13:34 ECRL DF8B-8007 (东风8B-8007)
13:45 ECRL DF8B Diesel Locomotive Startup
15:00 ECRL Kuantan Port City Railway Station
#ECRL #EastCoastRailLink #ECRLMalaysia #Malaysia #EastCoast #Kelantan #Terengganu #Pahang #Selangor #MalaysiaRailway