Drizzle Over the Strait, Toward Malmö and Hyllie
Öresund Bridge Timelapses
0:00 / 0:00
Drizzle Over the Strait, Toward Malmö and Hyllie
1 просмотр · 18 часов назад
Öresund Bridge Timelapses
44 подписчика
1 просмотр · 18 часов назад
A quiet morning on the Öresund Bridge, captured from the Swedish side. Overcast skies give way to light drizzle around 10:00, with a steady breeze keeping the water slight but choppy across the strait toward Malmö and Hyllie on the far shore. With the timestamp overlay, you can track real flights at Sturup (Malmö Airport) during the window: the SAS arrival from Stockholm (SK105) landed around 08:57, a Wizz Air flight in from Skopje (W64711) came in around 09:28, and a Norwegian air-taxi arrival (FT673) touched down around 10:06. A few departures ran a little early too — FT672 lifted off for Stockholm BMA around 07:40. On the bridge itself, road work caused a lane closure on The High Bridge in both directions during this period; speed is reduced through the work zone and wide or heavy vehicles are rerouted, while rail traffic runs as normal.
Captured 2026-10-16 06:29–10:43 local time.
15,000 frames (4.2 real hours) compressed into 4.2 minutes — roughly 60x speed.
Temperature ranged 13°C to 14°C.
Wind: 26–28 km/h.
Sea state: Slight (~0.4 m waves).
Sea level (Drogden): 20–27 cm above normal, rising.
Conditions through the window: 07:00 Overcast → 10:00 Light Drizzle.
🚢 Maritime traffic nearby during this window: Unknown vessel (MMSI 219010699) (Unknown), CGAS MARINER (Tanker → NOKAR), PILOT 213 SE (Pilot Vessel → PILOTAGE), FINNFELLOW (Passenger → SEMMA‹›DETRV), FURE VISKAR (Unknown), TYLA (Unknown), and 12 more.
✈️ Flights at Sturup (Malmö) during this window (match against the video's timestamp to spot them): SK105 landing ~09:20 (Stockholm ARN) [ApproachArrives 08:57], W64711 landing ~09:25 (Skopje) [ApproachArrives 09:28], FT673 landing ~10:20 (Stockholm BMA) [ApproachArrives 10:06], FT672 departing ~07:45 (Stockholm BMA) [Departed 07:40], DK1454 departing ~08:00 (Gran Canaria) [Gate closed], SK106 departing ~09:50 (Stockholm ARN) [Gate closed], W64712 departing ~10:00 (Skopje) [Delayed until 10:10Gate closed], FT674 departing ~10:45 (Stockholm BMA).
🚧 Road work (Lane closure) at The High Bridge, Both directions - expected until 2026-10-19T21:59:00Z UTC. SV: Hastigheten är nedsatt genom arbetsområdet. Breda fordon (över 3,75 meter) och tunga transporter (över 100 ton) kan inte passera förbindelsen under arbetet. Tågtrafiken påverkas inte och kör som vanligt. Vi beklagar besväret och tackar för förståelsen.
--- ENG: Speed is reduced through the work zone. Wide vehicles (over 3.75 metres) and heavy transports (over 100 tonnes) cannot use the crossing during the works. Rail traffic is not affected and runs as normal. We apologise for any inconvenience and thank you for your understanding.
--- DK: Hastigheden er nedsat ved arbejdsområdet. Brede køretøjer (over 3,75 meter) og tunge transporter (over 100 ton) kan ikke passere forbindelsen under arbejdet. Togtrafikken påvirkes ikke og kører som normalt. Vi beklager ulejligheden og takker for forståelsen.
ℹ️ Bridge status notice(s): Replacement of expansion joints until the end of October — Two of Øresundsbron's largest expansion joints are being replaced simultaneously – a solution that shortens the total project time by a full year. The work is planned to affect road traffic as little as possible.... | Øresundsmotorvejen is being expanded — Øresundsmotorvejen will be expanded over the coming years to improve traffic flow, which today is often characterised by extensive queues and congestion during rush hours....
🎵 Music: "Baby Steps" by Nate Blaze (YouTube Audio Library)
🎵 Music: "There's Something More" by The Soundlings (YouTube Audio Library)
🎵 Music: "Fall Colors" by ann annie (YouTube Audio Library)