Polavaram Left Main Canal Construction Status at Tuni 🚧 | Latest LMC Ground Reality | Kiran Tummala

Kiran Tummala

Polavaram Left Main Canal Construction Status at Tuni 🚧 | Latest LMC Ground Reality | Kiran Tummala

43 144 просмотра · 3 дня назад
Kiran Tummala
61,8 тыс. подписчиков
43 144 просмотра · 3 дня назад
#polavaram #water #development #Kirantummala Hello Friend Hope Everyone Is Fine.. Today's Vlog Covers The Polavaram Left Main Canal Construction Status at Tuni 🚧 | Latest LMC Ground Reality 2026 Hello My Friends, I hope you’re all doing well and staying safe. Today, I’m thrilled to take you along the stunning roads of Vizag, a city that never fails to impress with its scenic beauty and growing infrastructure. This is just the beginning. Very soon, I’ll be bringing you even more spectacular journeys — covering India’s grand highways, iconic bridges, and hidden wonders that you won’t want to miss! The Polavaram Left Main Canal (LMC) is one of the most important components of the Polavaram Irrigation Project, carrying the project's planned water supply towards East Godavari, Anakapalli and the Visakhapatnam region. In this video, we cover the latest Polavaram Left Main Canal construction status near Tuni, including ongoing canal works, earthwork, structures, canal formation and the latest ground reality. 📍 In This Video ✅ Polavaram Left Main Canal construction status ✅ Tuni LMC construction update ✅ Latest canal excavation and formation works ✅ Canal lining and structures ✅ Polavaram LMC ground reality ✅ Tuni irrigation project development ✅ Future Godavari water connectivity ✅ Anakapalli & Visakhapatnam water connectivity ✅ Polavaram Project latest developments ✅ Latest 2026 construction update The Polavaram Project Authority states that the LMC is 181.999 km long and is intended to provide irrigation to approximately 1.619 lakh hectares (4 lakh acres), along with 23.44 TMC of water for industries and drinking-water requirements in and around Visakhapatnam. The canal works have experienced delays and package-level issues over the years. The CAG's performance audit noted delays in LMC execution, including pre-closure of several packages and issues involving land acquisition and revised quantities. Recent project updates indicate that work on the left canal approach channel, head regulator and irrigation tunnel is ongoing, while the state has targeted completion of the Left Main Canal to enable Godavari water to reach Anakapalli. For the Tuni area specifically, recent tender records show balance LMC works under the Tuni-based PIPLMC Circle, including works around Km 93.700–111.000 and Km 111–136. 🎥 Watch the complete video for the latest Polavaram Left Main Canal ground reality at Tuni and seehow construction is progressing. 👍 Like | Share | Subscribe for more Andhra Pradesh irrigation, highway, railway and infrastructure updates. 🌍 With your love and support, I dream of showcasing not only India’s marvels but also the wonders of the world — one road at a time. If you’ve enjoyed this video, don’t forget to like, comment, and share it with your friends. Your support keeps me going and inspires me to explore more and bring you the best stories from the road. 📲 Let’s stay connected: 📸 Instagram → @kiran_tummala1 🐦 Twitter → @kirantummala1 📘 Facebook → Gang45 🎵 Background Music: All music used is from the YouTube Audio Library. Every trip I take is a new memory, and sharing it with you makes it even more special. Thank you so much for watching and for being a part of this journey. With gratitude, – Kiran Tummala