Macquarie Fields Station Upgrade — Completed September 2026
ranger82
0:00 / 0:00
Macquarie Fields Station Upgrade — Completed September 2026
126 просмотров · 3 дня назад
ranger82
700 подписчиков
126 просмотров · 3 дня назад
Macquarie Fields Station Upgrade
🏗️Construction Started: April 2025
✅Completed: 7th September 2026
➖Highlights➖.
🚊A new passenger footbridge, connected by lifts and stairs with increased canopy coverage to the platforms and enhanced platform connections from Railway Parade.
🚊Accessible parking spaces, accessible kiss and ride spaces, additional bike parking and a relocated bus stop on Railway Parade.
🚊Upgraded station forecourt and greater pedestrian connections to the station including a new pedestrian crossing in front of the station entrance and upgrades to the associated footpaths and kerb ramps.
🚊A new family accessible toilet and a new ambulant toilet.
🚊New hearing loops to assist people with hearing loss.
🚊Platform levelling, and installation of tactile ground surface indicators which assist passengers who are blind or have low vision.
🚊Safety and security at the station and surrounding precinct will be enhanced through improved lighting, CCTV, and wayfinding signage.
🚊Placemaking enhancements including Connecting with Country design elements.
📌 Every Station on T8 between
Line between Bexley North and MaCarthur is Wheelchair Accessible ♿️
➖Related Video ➖
East Hill Station Upgrade (April 2022)
• East Hills Station Upgrade — Completed Apr...
➖Chapters ➖
0:00 Introduction
0:46 New Pedestrian Crossing (Railway Pde)
0:57 Relocated Bus Stop (Railway Pde)
1:08 New Accessible Kiss and Ride Space (Railway Pde)
1:19 New Accessible Parking Space (Railway Pde)
1:30 New Bike Racks (Railway Pde)
1:41 New Station Entrance (Railway Pde)
1:54 New Ground Artwork
2:11 New Ceiling Artwork
2:24 New Stairs (Railway Pde to Platform 2)
2:41 New Ramp (Railway Pde to Platform 2)
3:04 Platform 2
3:19 New Platform Canopy (Platform 2)
3:30 New Station Building (Platform 2)
3:41 New Stairs (Platform 2 to Station Footbridge)
3:59 New Lift (Railway Pde / Platform 2 / Station Footbridge)
4:22 Station Footbridge
4:33 Station Footbridge (Facing West)
4:44 Station Footbridge (Facing East)
4:55 New Stairs (Station Footbridge to Platform 1)
5:12 New Lift (Station Footbridge to Platform 1)
5:29 Platform 1
5:44 Ext Canopy (Platform 1)
5:54 End of Introduction