Перейти к содержимому

Schindler lifts at Jewel Changi Airport (Lobby C)

CaJa 14

0:00 / 0:00

Schindler lifts at Jewel Changi Airport (Lobby C)

3 742 просмотра · 2 г. назад
CaJa 14
2,23 тыс. подписчиков
3 742 просмотра · 2 г. назад
This lift was installed in 2018 when the extension for Terminal 1 was open and only the lift that has maximum stops up to 1 was open back then. There used to be a temporary corridor from Terminal 1 only leading to the first floor lobby back then. Manufacturer: Schindler Floors: B5, B4, B3, B2, B1, 1, 2, 4, 5 Capacity: 36 persons 2450kg Model: 5500 Year installed: 2018 Rating: 50/50 History: Original, buttons replaced Camera: Samsung Galaxy S23 Ultra Date filmed: 14 April 2023