Building a Pumpkin Trebuchet: 12 ft Arm - Day 2: Raising the Uprights
Brett_Builds
0:00 / 0:00
Building a Pumpkin Trebuchet: 12 ft Arm - Day 2: Raising the Uprights
144 просмотра · 8 дн. назад
Brett_Builds
56 подписчиков
144 просмотра · 8 дн. назад
Day 2 of the 2026 pumpkin trebuchet build. The 12 ft arm is glued up, so today the uprights get drilled, raised and braced, and the bar goes across the top.
THE UPRIGHTS
Throwing arm: two 12 ft 2x6s, glued, screwed and clamped
Upright holes drilled on the drill press so they are square and line up for the top bar
Diagonal braces on both A-frames
A couple of uprights were not straight, so they got clamped and tightened
New this year: the support bars overlap at the top, which meant three holes to drill
Some supports reused from a previous build
CHAPTERS
0:00 Intro: the arm is glued, uprights next
0:45 Drilling the uprights
2:02 Raising and bracing the uprights
3:32 Clamping the uprights straight
5:18 Day 2 wrap-up and next steps
Next up: buttoning up the frame, wheels on, and first testing. Questions or suggestions? Drop them in the comments.
MORE TREBUCHETS
Day 1, building the base: • Building a Pumpkin Trebuchet: 12 ft Arm - ...
Day 0, planning and simulation: • Building a Pumpkin Trebuchet: 12 ft Arm - ...
The full 2026 build playlist: • Pumpkin Trebuchet Build (2026)
Last build (10 lb pumpkins, 2023): • How to Build a Pumpkin Trebuchet (Throws 1...
Every part, one short video each: • Trebuchet Parts
Plans and build logs: https://realtrebuchet.com
#trebuchet #pumpkintrebuchet #diy #woodworking #engineering