Ambattur Subway Work ! Finally Reached Finishing Stage
Nambi Valavan
0:00 / 0:00
Ambattur Subway Work ! Finally Reached Finishing Stage
2 037 просмотров · 1 месяц назад
Nambi Valavan
23,8 тыс. подписчиков
2 037 просмотров · 1 месяц назад
Ambattur subway work shared in this video.
Almost major work completed. Storm water drainage connectivity to drainage well need to be completed. At Varadharajapuram & Venkatapuram side ( Ambattur O.T. ) subway main carriage way portion is completed.
Only at the middle portion of the subway storm water drainage connectivity work is pending. Staircase case was constructed in the middle portion of the subway at both sides.
At Varadharajapuram side staircase located very near to Ambattur station platform 1. So passengers coming from Ambattur railway station can access this Pedestrian staircase to reach Venkatapuram side ( Ambattur O.T. ) safely below railway track through subway.
Still Light installation, painting, lane marking, signage board , tar laying & Storm water drainage work is pending.
If everything goes well in the next 2 months pending work can be completed