Перейти к содержимому

CREATING FIRE FIGHTING TEMPLATE IN REVIT MEP II FIRE FIGHTING PROJECT IN REVIT SOFTWARE II.

Success Engineering Official

0:00 / 0:00

CREATING FIRE FIGHTING TEMPLATE IN REVIT MEP II FIRE FIGHTING PROJECT IN REVIT SOFTWARE II.

915 просмотров · 4 г. назад
Success Engineering Official
9,84 тыс. подписчиков
915 просмотров · 4 г. назад
IN THIS VDO WE WILL LEARN HOW TO CREATE FIRE FIGHTING TEMPLATE IN REVIT SOFTWARE II https://drive.google.com/file/d/1aDt6... (PACKAGE AC DIMENSIONAL DRAWING) https://drive.google.com/file/d/1zzLG... (PACKAGE AC PLAN IN AUTOCAD)    • DRAFTING FOR PACKAGE AC UNIT AS PER MANUFA...   (PACKAGE AC DRAFTING) https://drive.google.com/drive/folder... (FIRE FIGTING MATERIALS)    • HOW TO STUDY VRF OUTPUT REPORT GENERATED B...   (STUDY OF VRF REPORT)    • HOT WATER DEMAND CALCULATION FOR FIVE STAR...   (HOT WATER DEMAND) https://drive.google.com/drive/folder... (VRF SELECTION REPORTS & LOAD CALCULATION SHEET) https://drive.google.com/file/d/1HEvZ... (HOT WATER DEMAND CALCULATION SHEET) https://drive.google.com/file/d/1a0RL... (HOT WATER DEMAND STANDARD) https://drive.google.com/file/d/1QiAS... (HEAT LOST CALCULATION FORMAT)    • MACHINE SELECTION WITH ZAMIL E-SELECTOR SO...   (MACHINE SELECTION WITH ZAMIL SOFTWARE) https://drive.google.com/drive/folder... (AC CATALOGUE / TECHNICAL DATA SHEETS AND MACHINE SELECTION FILE PDF)    • HEAT LOST CALCULATION FOR WINTER SEASON I ...   (HEAT LOST CALCULATION)    • MACHINE SELECTION AS PER AC UNIT DATA SHEE...   (MACHINE SELECTION PART-1)    • ESTIMATION & COSTING OF HVAC PROJECT II IN...   (ESTIMATION AND COSTING)    • QUANTITY TAKEOFF FOR HVAC PROJECT II AS PE...   (QUANTITY TAKEOFF) https://docs.google.com/spreadsheets/... (ESTIMATION SHEET) https://docs.google.com/spreadsheets/... (QUANTITY TAKEOFF SHEET)    • BASEMENT VENTILATION II CAR PRKING VENTILA...   (BASEMENT VENTILATION) https://drive.google.com/file/d/1MMQL... (CAR PARKING VENTILATION) https://drive.google.com/file/d/1u3po... (DESIGN DRAWING G+8 HOTEL PROJECT)    • CHILLED WATER PUMP SELECTION II WITH EXCEL...   (PUMP SELECTION) https://docs.google.com/spreadsheets/...    • TOILET VENTILATION DESIGN THEORY PART II A...  (TOILET VENTILATION THEORY BASIC) https://drive.google.com/file/d/1KZNZ... https://docs.google.com/spreadsheets/... https://docs.google.com/presentation/... usp=sharing&ouid=106513333153867833277&rtpof=true&sd=true https://drive.google.com/file/d/17umO... (FIRE FIGHTING DOCUMENTS)    • CHILLED WATER PIPE SIZING WITH VELOCITY ME...  (CHILLER WATER PIPE DESIGN WITH MANUAL CALCULATION) https://docs.google.com/spreadsheets/... (CACULATION SHEET) https://drive.google.com/file/d/1U8Fr... (PIPING LAYOUT) https://drive.google.com/file/d/1SfiF... (TYPES OF AC UNITS PDF FILES)    • TYPES OF AC UNITS & ITS APPLICATIONS II NO...   (TYPES OF AC UNITS) https://drive.google.com/file/d/14uh6... (SHOPPIN MALL DRAWING) https://drive.google.com/file/d/167Ja... (FITTING LOSS COEFFICIENT ASHRAE 2001) https://docs.google.com/spreadsheets/... (ESP CALCULATION AND DUCT DESIGN SHEET)    • DUCT DESIGNING II DUCT SIZING II EQUAL FRI...   (DUCT DESIGN)    • ESP CALCULATION WITH EXCEL PROGRAM IN ACTU...   (ESP CALCULATION WITH EXCEL PROGRAM)    • TAGGING IN REVIT II TAG ALL II TAG BY CATE...  (TAGGING IN REVIT)    • HOW TO CREATE SECTION IN REVIT II SECTION ...   (SECTION IN REVIT)    • GRID FALSE CEILING CREATION II AUTOMATIC A...   (CEILING CREATION IN REVIT)    • COOLING & HEATING LOAD CALCULATION BY HAP ...   (COOLING LOAD CALCULATION BY HAP SOFTWARE)    • HEAT LOAD CALCULATION USING E20 EXCEL SHEE...   (COOLING LOAD CALCULATION BY E20 EXCEL PROGRAM)    / ffhrzr9      • COLD WATER PIPE SIZING II INTERNATION PLUM...   (COLD WATER PIPE SIZING)    • WINDOW PLACEMENT IN REVIT II रेविट आर्किटे...  (WINDOW PLACEMENT IN REVIT)    • DOOR PLACEMENT IN REVIT II DOORS FIXING II...   (DOOR PLACEMENT IN REVIT)    • HOW TO CREATE LINE TYPE IN AUTOCAD II MKLT...   (MKLTYPE COMMMAND)    • DUCT FABRICATION IN REVIT MEP II FABRICATI...  (DUCT FABRICATION)    • HOW TO PLOT ANY POINT ON PSYCHROMETRIC CHA...  (ADDING POINT ON PSCYCHROMETRIC CHART)    • HOW TO CREATE MULTI STOREY BUILDING IN REV...   (MULTI STOREY BUILDING IN REVIT)    • Duct Quantity takeoff II duct schedule II ...   (DUCT QUANTITY TAKEOFF)    • PIPE PRESSURE LOSS CALCULATION REPORT II P...   (Pipe pressure loss calculation report)    • How to place fitting & accessories for chi...  (FITTING & ACCESSORIES FIR CHILLER, PUMP AND FCU IN REVIT MEP)    • Air terminal schedule and quantity takeoff...  (Air terminal schedule in REVIT MEP)    • WATER SIDE COMPONENT IN REVIT MEP II CHILL...  (water side component    • Chilled water supply and return pipe sizin...   (CHILLED WATER PIPING IN REVIT MEP)