120|RT Maintains Zinc Production Facility in Western NC
Link-Belt Cranes
0:00 / 0:00
120|RT Maintains Zinc Production Facility in Western NC
497 просмотров · 2 нед. назад
Link-Belt Cranes
5,38 тыс. подписчиков
497 просмотров · 2 нед. назад
Befesa Zinc Metal utilizes a 120-ton Link-Belt 120|RT for general maintenance and operations-based lifts across its zinc production facility in western North Carolina.
Based in Mooresboro, North Carolina, the machine is on long-term rental from Link-Belt distributor Atlantic & Southern. The 120|RT features a six-section 38.3–164.1-foot (11.6–50-meter) pin and latch formed boom, built at Link-Belt’s Lexington, Kentucky, USA, facility.
•
•
Follow Link-Belt Cranes:
Website: https://www.linkbelt.com/
LinkedIn: / linkbeltcranes
Instagram: / linkbeltcranes
X: https://x.com/LinkBeltCranes
YouTube: / @linkbeltcranes
Threads: https://www.threads.net/@linkbeltcranes
#linkbelt #crane #americanbuilt #construction #roughterrain