9 803 просмотра · 10 лет назад
Bosch Rexroth
37,5 тыс. подписчиков
9 803 просмотра · 10 лет назад
Ready for the Stage in Nine Weeks The stage technology of the tradition-steeped Burgtheater in Vienna dates from the early 1990s and did no longer meet current performance and safety requirements. Bosch Rexroth projected a new control system complete with its hardware and software components and took on the entire installation and commissioning process. Except for a longer break during the summer, the theatre is almost continuously operated, so that all refurbishments had to take place within a timeframe of nine weeks. Solved with -SYB 3.0 stage control system -Hydraulic drives -Remote maintenance via VPN from Rexroth’s company site at Lohr, Germany