Prague funicular to Petřín
Prague Public Transport Explorer
0:00 / 0:00
Prague funicular to Petřín
118 просмотров · 8 дней назад
Prague Public Transport Explorer
113 подписчиков
118 просмотров · 8 дней назад
The new Petřín cable car reopened on 22 September 2026 following a two-year refurbishment (which began after it was damaged and flooded in 2024).
• ‘Winking’ cabins: When passing each other halfway along the route, the two cabins interactively ‘wink’ at one another – one cabin changes the colour of its interior lighting.
• Larger windows and increased capacity: The cabins feature generous glazed walls and a glazed ceiling for a better view of Prague. The capacity of the cable car has increased from 100 to 120 passengers (19 seats and approximately 100 standing).
• Operating parameters:
• The route is 509 metres long (Újezd – Nebozízek – Petřín) with an elevation gain of approximately 126 metres.
• The journey takes between 3.2 and 4 minutes.
• The cable car runs daily at 10-minute intervals (between 7.00 and 22.15).
• Historical roots: The original funicular was built on Petřín as early as 1891 to mark the Jubilee Provincial Exhibition (at that time it was water-powered).
• Record-breaking demand: In the very first weeks after it opened, it broke historical records for the number of passengers carried.