How Pioneering Spirit Lifted a 24,000-Tonne Oil Platform
Brutal Endeavors
0:00 / 0:00
How Pioneering Spirit Lifted a 24,000-Tonne Oil Platform
111 просмотров · 12 дн. назад
Brutal Endeavors
4 подписчика
111 просмотров · 12 дн. назад
Pioneering Spirit removed Brent Delta’s enormous topsides in one piece in April 2017. This Brutal Endeavors film follows the complete job: preparing the structure, connecting sixteen lifting beams in eight paired units, transferring the weight with ballast, lifting clear, and bringing the platform ashore through Iron Lady and a hydraulic skidding system.
Watch NASA’s crawler transporter: • How NASA Moves a Moon Rocket | Crawler-Tra...
Extreme Engineering & Heavy Machinery collection: • Extreme Engineering & Heavy Machinery | Br...
Subscribe: / @brutalendeavors
CHAPTERS
00:00 A platform becomes cargo
01:38 Three legs and a new load path
02:26 Preparing eight lift points
03:38 Cut, restrained and waiting
05:18 Pioneering Spirit and sixteen beams
06:31 Weather and positioning
08:05 Connections and motion compensation
08:54 Ballast and weight transfer
09:41 The rapid lift
10:31 Securing the cargo
11:43 The Iron Lady handoff
12:33 Tugs, tide and the receiving quay
13:20 Skidding the topsides ashore
VISUALS
Original AI-assisted illustrative reconstructions, not Allseas or Shell archival footage. Technical reference photographs informed the hardware review; interiors and crew are illustrative. Narration uses Chris, our established synthetic narrator. Original atmospheric music composed for this film.
FACTUAL NOTES
The removed cargo was the topsides; three concrete legs remained offshore. Approximately 24,000 tonnes is rounded: Shell’s completion record measured 23,727 tonnes, while project summaries commonly quote the 24,200-tonne estimate. The completion report records a 15-second rapid lift and roughly 1.5 m clearance; promotional summaries say ten seconds. This was one stage of a much longer operation. The vessel layout shown is the 2017 configuration. No claim that the lift remains today’s world record or that a forecast recycling percentage was achieved.
PRIMARY SOURCES
Allseas — Brent Delta topsides removal (2017 project): lift and marine transfer.
https://www.allseas.com/en/what-we-do...
Shell — Brent Delta Topsides Interim Close Out Report: pp. 18–22 preparation; 25–29 lift/caps; 30–35 handoff/skidding; Table 4 p. 36 weight and timing.
https://www.shell.co.uk/about-us/sust...
David Gration — The Arup Journal, 2019 Issue 1, pp. 34–39: restraints, eight lift points, historic vessel/beam configuration.
https://www.arup.com/globalassets/dow...
Shell UK — Brent Delta Platform Lift (2017): working-platform context and preparation.
https://www.shell.co.uk/about-us/sust...
ICT/Raster — How do you safely lift a gigantic offshore platform with a ship in a single move? (April 5, 2016): TLS motion control and monitoring.
https://www.ict.eu/en/stories/how-do-...
Allseas — Pioneering Spirit successfully installs test platform (August 2016): earlier full-scale trials.
https://www.allseas.com/en/who-we-are...
Allseas — Pioneering Spirit completes Topsides lift system harbour tests (2016): twelve beams for earlier work; four more planned for Brent Delta.
https://www.allseas.com/en/who-we-are...
Able UK — Marine Decommissioning: Brent Delta received and skidded onto the quay in May 2017.
https://www.ableuk.com/able-marine-de...
#PioneeringSpirit #BrutalEndeavors #HeavyLift