CPX-AP-I-EC EtherCAT Remote I/O with Festo PLC | 3/3 Commissioning
Festo Service
0:00 / 0:00
CPX-AP-I-EC EtherCAT Remote I/O with Festo PLC | 3/3 Commissioning
1 753 просмотра · 3 г. назад
Festo Service
10,2 тыс. подписчиков
1 753 просмотра · 3 г. назад
The Festo tutorial is about commissioning the CPX-AP-I-EC EtherCAT Remote I/O with a Festo PLC. The third video shows you how to do the commissioning using Codesys.
Chapters:
00:00 Parts list: products
00:18 Application Note
00:27 Creating a new project in Codesys
01:18 Adding a new gateway to the project
01:46 Detecting the actual hardware configuration of the controller
02:24 Adding the ESI file of CPX in Codesys.
03:39 Adding CPX devices in Codesys
05:19 Adding the library of CPX in Codesys.
07:06 Process Data Input Monitor and Output Control
08:50 Diagnostics of CPX-AP-I
- -
Application Note:
Find detailed instructions on this topic: CPX-AP-I-EC-M12 Integration with Festo PLC over EtherCat https://www.festo.com/in/en/a/8086609...
- -
Products shown in the video:
4252743 PLC, CPX-E-CEC-M1-PN, Rev 05
8086609 Head module, CPX-AP-I-EC-M12, Rev 01
8086604 IO-Link master, CPX-AP-I-4IOL-M12, Rev 01
8101539 Electric cylinder unit, EPCE-TB-45-10-SL-ST-M-H1-PLK-AA, Rev 01
- -
Any further questions or feedback?
Please contact us via: https://www.festo.com/contact
- -
Festo website:
Visit us.
https://www.festo.com
- -
*Festo Service*:
The channel for everything to do with service and support. Quickly and easily commission, configure, operate and repair Festo products. The tutorials from Festo Service will help you!
- -
Safety instructions:
All guidelines, regulations and specifications applicable in the country in which you are located must be complied with before, during and after carrying out this work. Only qualified specialized personnel who have undergone training and instruction are permitted to install, repair and commission the equipment; such work must be carried out in accordance with the operating instructions for the products concerned. All equipment must always be switched off before commencing maintenance and repair work. All power supplies must be permanently disconnected. Some protective devices are taken out of operation during maintenance and repair work. They must be properly reinstalled and put back into operation immediately after the work has finished, and their correct functioning must be checked. Prior to starting work you must read and understand the safety instructions and the instructions for handling the product in full. You must also ensure compliance with these instructions at all times whilst carrying out your work. No liability whatsoever shall be accepted for damage caused by noncompliance. Although every care has been taken when drafting these instructions, Festo SE & Co. KG does not accept any liability for any errors they may contain or the consequences of such errors. Likewise, no liability is accepted for direct or consequential damage resulting from incorrect use of the products and tools. Compliance with the applicable regulations governing occupational safety, safety engineering and interference suppression, as well as the stipulations contained in these operating instructions, is a mandatory requirement when working with the products. The General Terms and Conditions of Festo SE & Co. KG, which can be viewed on the Festo website (www.festo.com), also apply. Should you have any questions or concerns, please contact Festo SE & Co. KG directly. Do not start work until these questions or concerns have been clarified.
#Festo #cpx-ap-i #cpx-ap-i-ec