Перейти к содержимому

LAGUNA LAKESHORE ROAD NETWORK PROJECT CP2 SEGMENT 2 Phase 1,Cabuyao, Laguna Area!

Alex B vlog

0:00 / 0:00

LAGUNA LAKESHORE ROAD NETWORK PROJECT CP2 SEGMENT 2 Phase 1,Cabuyao, Laguna Area!

9 878 просмотров · 2 недели назад
Alex B vlog
6,79 тыс. подписчиков
9 878 просмотров · 2 недели назад
#laguna #lakeshore #roadnetwork #llrn The Laguna Lakeshore Road Network Project includes a designated interchange and alignment passing through Cabuyao, Laguna, as part of its Phase 1 development. [1] Project Overview for Cabuyao Role of Cabuyao: Cabuyao is one of the eight designated strategic interchange locations along the Phase 1 main alignment. Phase 1 Scope: Features a 37.60-kilometer mainline primary road from Lower Bicutan, Taguig to Calamba, Laguna, combining viaducts and shoreline embankments. Contractor: Beijing Urban Construction Group Co., Ltd. Timeline: Construction started on November 12, 2025, with an expected completion date of November 11, 2028. Cost: PHP 16,955,086,921.72 for Tranche 1 (Cabuyao-Calamba section). Funding Source: Asian Development Bank (ADB) Loan No. 4523-PHI via the Department of Public Works and Highways.