Montrose BLP topside for Repsol Sinopec
Heerema Fabrication Group
0:00 / 0:00
Montrose BLP topside for Repsol Sinopec
35 601 просмотр · 9 л. назад
Heerema Fabrication Group
5,88 тыс. подписчиков
35 601 просмотр · 9 л. назад
The Montrose Bridge Linked Platform was constructed at Heerema Zwijndrecht. The construction of the topside started in March 2013 and was completed within three years.
End April 2016 the project was transported to the offshore location and installed by HMC's crane vessel Thialf.