[Much Newer] Hitachi High-Speed Traction Elevators At Block 908A & 908B UrbanVille @ Woodlands
SG3251K Transportations
0:00 / 0:00
[Much Newer] Hitachi High-Speed Traction Elevators At Block 908A & 908B UrbanVille @ Woodlands
92 просмотра · 7 дн. назад
SG3251K Transportations
1,21 тыс. подписчиков
92 просмотра · 7 дн. назад
Date Filmed: 19 October 2026
As The September School Holidays For 2026 Has Come To The End, It Is Currently The Term 4. The Term 4 Is Running Until The Mid-November 2026 If I Think Since The Term 4 Has 10 Weeks, Similar To The Term 3 Style. The Term 4 Is Part Of The Semester 2 While The Semester 1 Is Served By Term 1 & 2 In Every Year Which Includes Of 2026. Since The Time Might Travel Fast, I Might As Well See How Much Things I Would Be Able To Film.
Before I Said More Of It, The School Holidays Would Be Getting Another One Step Closer Very Soon As Some Of The Secondary Schools Would End By End-October 2026 While The Primary School Would Continue To Run Until The Last Term 4 Of The Week 10. The School Term Isn't Really Having The School Holiday As Mostly On Sundays, The Sundays Would Be Put As Public Holiday Since No One Would Work On The Every Sunday Week Of The School Term Period.
The School Term Plays The Role Of Having School Serving Every Day Except That Some Of Them Might Happen To Occur For School Celebrations, Like The Chinese New Year, National Day & Teacher Day. Racial Harmony Day Would Also Be Included But The Secondary School Would Have It During The Normal Lesson To Prevent More Disruption From Happening. So As These Celebrations Were Cleared For This Year, It Would Repeat For Another Next Year.
Since The Week 5 Of The Term 4 Is Already Over, It Is Time That It Is The Term 4 Week 6. The Week 6 Of The Term 4 Would Run From 19 October 2026 To 25 October 2026 and Then From 26 October 2026, The Term 4 Week 7 Would Start. As The Day 5 Enters For The Term 4 Week 6, I Have Decided To Visit The Very Brand New Sparkling HDB Flat Which Has Recently Opened To The Public Since 5 June 2026 When I Read It On The Internet.
The New BTO HDB Flat Is Called "UrbanVille @ Woodlands". Since Because I Didn't Enter It Before, I Wanted To Experience It To See What The Elevator Brand Would Be Use For The UrbanVille Woodlands. The UrbanVille Woodlands Is Located At The Woodlands Area, Which Can Be Easily Be Access By Public Transport and It Is Woodlands MRT Station. The Woodlands MRT Station Can Be Use Either The North South Line Or The Thomson-East Coast Line.
Quite Some Few Months Ago Before The New BTO Flat Comes To Complete, I Actually Have Saw The Construction Progress Which I Could See It When I Was At The North South Line Platform Area. So After Long Time Of Making Which Includes The Part Of The Project, The Whole Place Is Almost Complete, With Some Parts Of The UrbanVille Woodlands Were Not Ready Yet and Were Still Barrier Up.
The UrbanVille Features Comprehensive Range Of Outdoor, Recreational, Commercial and Community Facilites Integrated Within It's 8-Block HDB Development. Multiple Themed Play Areas, Including Box-Tower Playground At Block 909 With Climbing Nets, Slides Bubble Windows, and Three-Way See-Saw, Alongside An Attap Hut-Themed Setup. Modern Outdoor Exercise Equipment and Fitness Corners Spread Across The Estate.
A Multi-Purpose Hard Court For Sports and Community Activities. Lush Multi-Tiered Roof and Sky Gardens, Includes Prominent Sky Bridge Connecting To The Twin 32-Storey Towers On The 24th Floor Which Is Not Open To The Public Yet As The Sky Bridge Is Not Completed Yet As Of October 2026. The Color Exterior Of The Building Is Modern, Sleek Exterior Palette Dominated By Clean Whites, Cool Greys, and Muted Teal-Blue Accent Panels.
The High Rise Residential Towers Primarily Feature Dominant Cool White To Light Grey Base. Structural Indentations and Balcony Profiles Are Accented With Distinct Medium To Deep Teal-Blue Shade, Paired With Constrasting Window Frame Trims. The Lower Car Park, Commercial Spaces and Integrated Sky Bridge Introduced Warmer Earthy Wood-Toned Grilles and Vibrant Green Roofs To Echo The Wooded Estate Theme.
Featuring In This Video Is The Elevators Which Is Currently Serving For The Block 908. The Block 908 Has 2 Of Them Which Feature Block 908A & Block 908B. Block 908A Has 23 Floors While Block 908B Has 32 Floors. For Block 908B, The Lift Skips Floor 2, 25 & 26.
↓Lift Information↓
Brand: Hitachi
Model: MCA
Capacity: 13 Persons 885 kg
Floor served: L1, L2x, L3, L4, L5, L6, L7, L8, L9, L10, L11, L12, L13, L14, L15, L16, L17, L18, L19, L20, L21, L22, L23, L24*, L25x*, L26x*, L27*, L28*, L29*, L30*, L31*, L32* [*Serve For Block 908B] [x Not Serve For Block 908B]
Announcement: Yes [For Block 908A], No [For Block 908B]
Chime: Yes [For Both Block 908A & 908B]
Year Installed: 2025
History: Original
Rating: 100+/100
Please do not Upload or use my videos without any permission, As well as Reporting my channel and any of my videos. Also Please don't dislike and No writing any hate comments! Any Hate comments will be removed at any time.
Elevator Filming is not a crime!
Recorded Using Vivo Y38