Trains At Barking , LTSML & Goblin line, 20/09/22
East London Transport
0:00 / 0:00
Trains At Barking , LTSML & Goblin line, 20/09/22
3 521 просмотр · 3 года назад
East London Transport
1,03 тыс. подписчиков
3 521 просмотр · 3 года назад
Barking is an interchange station serving the town of Barking, east London. It is served by London Underground, London Overground and National Rail main line services. It is located on Station Parade, in the town centre.
On the Underground it is a stop on the District line and is also the eastern terminus of the Hammersmith & City line; on the National Rail network it is served by c2c services operating to and from Fenchurch Street; and on the Overground it is the former eastern terminus of the Gospel Oak to Barking line, which has now been extended to Barking Riverside. There is also interchange with London Buses and East London Transit routes on the station frontage. The Underground station is the busiest in the network outside of Zones 1 and 2.
The station was opened in 1854 by the London, Tilbury and Southend Railway as one of the first stations on the route. It was rebuilt in 1908 and again in 1959. As of February 2012, significant redevelopment of the station is currently proposed by Barking and Dagenham London Borough Council and the Department for Transport.
The station was opened as part of the London Tilbury & Southend Railway (LT&SR)’s new line which left the Eastern Counties Railway's (ECR) main line at a new junction at Forest Gate. Two separate LT&SR trains from London started at Fenchurch Street and Shoreditch and were combined at Stratford for the journey to Tilbury (and split at Stratford in the opposite direction). Barking at this time was a small village and the original station was a two platformed affair which opened on 13 April 1854. Congestion at Stratford and deteriorating relationships between the lessees running the LT&SR and the Eastern Counties Railway saw a new route built between Barking and Gas Factory Junction where the new route joined the London & Blackwall Extension Railway, opening in 1858. Other than a new junction west of Barking (and west of the River Roding bridge) no changes were made at Barking and the original Forest Gate Junction section was then used by a goods trains and a rump Bishopsgate to Barking service operated by the ECR and after 1862 by the Great Eastern Railway.
Between the River Roding and the station there was a level crossing at Tanner Street and one on East Street at the east end of the station. Around 1860 some coal sidings were laid on the south side of the line west of the station.
The new Pitsea direct route opened in stages first to Upminster (1885), East Horndon (1886) and finally joining the existing Southend route at Pitsea in 1888. A new junction was provided 200 yards east of Barking station and this was controlled by a new signal box called Barking East Junction. The former Barking Junction box to the west was renamed Barking West Junction.
This station lasted until the 1880s when increasing passenger and goods traffic as well as issues with the level crossings at Barking (which was expanding) meant something needed to be done.
The changes for the 1889 rebuilding were:
⚫️ An additional through platform on the down side of the station to allow the GE Liverpool Street service to run round away from the through platforms.
⚫️ The two existing platforms were extended to accommodate longer trains
⚫️An up bay platform for departing services only
⚫️New station building
⚫️New cattle dock
No changes were made to level crossing arrangements despite increasing usage, although a number of minor foot crossings were closed in 1900/1901.
The rebuilding was in advance of the arrival in Barking of services from the Tottenham and Forest Gate Railway (T&FGR) which opened in July 1894. Although a joint venture between the LT&SR and Midland Railway the majority of the services were operated by the latter company.
Around the turn of the century Barking Town Urban District Council were seriously concerned about the amount of time that East Street Gates were closed to road traffic. In 1902 the LT&SR made some minor changes to the signalling arrangements which helped and these were a prelude to further changes in the area. A new bridge over the River Roding was opened in 1900 and the original river bridge was replaced in 1903. The new scheme saw the Great Eastern/T&FGR trains operating over the northern lines and the LT&SR trains on the southern lines.
Joining me was The Greater London Trainspotter please like and subscribe to his channel as he does amazing content
We’ll be seeing services by c2c, London overground, London Underground and some freight as well
I hope you enjoy this video if you did smash that like button and don’t forget to subscribe for more upcoming content and leave any comment below and feel free to leave any recommendations below as I’ll try get back to them as soon as I can and I try organise some plan to sort it out
My next station will be Stratford I haven’t visited Stratford for awhile and it would be a good place for me to do train spotting so until then thanks for watching and I’ll see you in the next video