How a British Firm Sank 250 Piles Into Sand to Hold Up the Burj Al Arab
Britain Built
0:00 / 0:00
How a British Firm Sank 250 Piles Into Sand to Hold Up the Burj Al Arab
901 просмотр · 8 дней назад
Britain Built
2 подписчика
901 просмотр · 8 дней назад
The Burj Al Arab: 321 metres tall, standing on an artificial island 280 metres offshore, containing over 70,000 cubic metres of concrete and more than 9,000 tonnes of structural steel, opened on 1 December 1999. Not one of its piles reaches rock. The building was designed by the British consultancy W S Atkins, with Tom Wright as architect and Rick Gregory as project director, and the whole structure is carried on around 250 piles of around 45 metres, held in the ground by friction alone. This documentary covers the foundation rather than the silhouette: the difference between end bearing and shaft friction and why the second one was the only option available, why the carbonate sands of the Arabian Gulf crush under a pile and give a fraction of the grip that ordinary quartz sand gives, why the piles were bored under bentonite rather than driven, why load testing on site replaced calculation as the basis of the design, how a reclaimed island is compacted and left to settle before anything is built on it, why the wave armour and its filter layers went in first, and why wind on a 321 metre building means a large number of those piles are designed to be pulled out of the ground rather than pushed into it. Sources include Atkins project material and Structurae, with divergent figures declared out loud rather than resolved silently. Subscribe to BRITAIN BUILT for the engineering behind the works that made this country, and the ones Britain built everywhere else.
#BurjAlArab #Megaprojects #HowItsMade #Foundations #Engineering #GeotechnicalEngineering #Construction #Atkins #Piling #BritishEngineering #Dubai #ArtificialIsland #FullProcess #Trending
IMPORTANT: ABOUT THIS VIDEO
This is an educational documentary analysing the engineering and construction of public infrastructure, based entirely on open-source information. All visuals and animations are 100% synthetic, AI-generated conceptual representations. No real footage of the construction sites or personnel was used. This video is purely informational and intended for educational purposes only.