Complete Real Time Canada Line Ride - Richmond-Brighouse to Waterfront
UpLift Vancouver
0:00 / 0:00
Complete Real Time Canada Line Ride - Richmond-Brighouse to Waterfront
9 589 просмотров · 5 лет назад
UpLift Vancouver
3,03 тыс. подписчиков
9 589 просмотров · 5 лет назад
(08/13/2020) Take a complete journey aboard the Canada Line from Richmond-Brighouse to Waterfront Station. This line was opened in 2009 in time for the 2010 Winter Olympics in Vancouver. An upgrade is planned along the Richmond branch of this line in the form of a new station at Capstan Way, which is expected to open in 2022.
Train: 2019 Hyundai-Rotem EMU