Перейти к содержимому

Building an Epic Office in 30 Days: The Versatility of Precast Concrete Panels

Property Noma

0:00 / 0:00

Building an Epic Office in 30 Days: The Versatility of Precast Concrete Panels

60 868 просмотров · 3 года назад
Property Noma
75,9 тыс. подписчиков
60 868 просмотров · 3 года назад
Kingdom Precast decided to use their technology to build their 2-floor office block. The structure was put up in a month, while Sammy and his team took their time with the finishing of their office. This office design can also work as a house design. Here are some details: -The structure is built entirely using precast panels and steel -Even the slab base is made of precast panels -The floor area is 147 SQM -Structure cost = KSh 2.8M (USD 19.9K) -Finishing cost = Ksh 1.2M (USD 8.4K) -Total cost = Ksh 4M (USD 28.2K) -It has a flat rooftop balcony. -The panels height: ground floor = 3m, 1st floor = 2.5m, parapet wall = 1m -MasterSeal waterproofing was applied for the roof top balcony -Crown's Transeal clear sealer was painted on the exterior walls of the office as a varnish -The steel columns were plastered and hidden with concrete to blend in with the façade of the structure Enjoy the construction updates in the video. I'll come back and do a final tour of the office later on. CONTACTS: Sammy Wambua (Client & Supplier of precast panels) +254 714 259226 Location: Northern Bypass Road, Ruaka Pin: https://maps.app.goo.gl/VdZQdjsyHhfcc... -------------------- SUPPORT THE CHANNEL Mpesa: +254790165523 (Nicholas Muema) Buy me a coffee - https://ko-fi.com/propertynoma Paypal Donate - https://www.paypal.com/donate/?hosted... -------------------- CONSULT WITH ME Email: propertynoma5@gmail.com Whatsapp: +254790165523 -------------------- CHAPTERS 0:00-25th February update (introduction to the office project) 2:40-11th March update (casting the 3 inch concrete slab on top of the panels) 6:25-25th March update (discussion with Sammy; casting the roof top slab; structure complete) 15:21-22nd April update (Arch. Raphael's walkthrough of the office structure) 31:35-Finishing update (walkthrough with Sammy)