How to make Concrete Cover blocks
50 kg Cement
100 kg washed M sand or Coarse River Sand
50 kg stone chips under 6 mm
18 to 19 ltr water ( if all raw material dry)
400 mL Hard&Shine SCC admixture for Precast
Step 1
Take 15 ltr water and Mix 400 mL Hard&Shine SCC admixture and Pour this water into Pan Mixer
Step 2
Put 50 kg stone Chips and 100 kg Washed M sand or River sand into Pan Mixer and run the mixer for 1 minut.
Step 3
Put 50 kg cement into Pan mixer and Run the Mixer for 3 minute.
Step 4
Use remaining 3 to 4 ltr water for desired workability, use only that much of remaining water which is required for Desired workability and flow.
Step 5
Fill this concrete in Coverblock moulds and vibrate atleast 3 minutes for better compaction and than keep the moulds in a plain surface and cover the moulds with Tarpaulin.
Step 6
Demold the casted cover blocks after 18 to 20 hours. And keep the in Shade area not in Direct sunlight for 3 days and than dispatch to customers.