Edsa Rehabilitation Ortigas to Boni Phase 2 Nagsimula na
Neonflix
0:00 / 0:00
Edsa Rehabilitation Ortigas to Boni Phase 2 Nagsimula na
9 564 просмотра · 1 месяц назад
Neonflix
81,3 тыс. подписчиков
9 564 просмотра · 1 месяц назад
Edsa Rehabilitation Ortigas to Boni Phase 2 Nagsimula na
The second phase of the EDSA rehabilitation project appears to refer to a specific infrastructure program or timeline, but the exact scope and current implementation status depend on the specific government administration and agency (such as the DPWH) undertaking it.
Since the term can vary based on context, here are the most likely aspects typically associated with such a project:
· Scope of Work: Phase 2 usually covers a specific segment of the highway not addressed in Phase 1. This typically involves re-blocking deteriorated concrete, asphalt overlaying, and drainage system repairs or declogging.
· Structural Evaluation: Projects often include structural assessments of major flyovers and bridges along the corridor to ensure safety and longevity.
· Utility Relocation: A significant phase often addresses the relocation or burial of utility lines and poles, which is critical for road widening or the installation of bike lanes.
· Inter-agency Coordination: Rehabilitation is rarely solely a road-widening project; it typically involves coordination with the MMDA for traffic management, DOTr for public transport, and local LGUs for sidewalk and pedestrian lane improvements.
To get the precise schedule, affected areas, and budget for Phase 2, it would be best to check the latest press releases from the Department of Public Works and Highways (DPWH) or the Metropolitan Manila Development Authority (MMDA).