How We Synchronize LED Screen, Lighting & Sound with Timecode | Road To The Star Season 5 | AEON II
LED EVENTS
0:00 / 0:00
How We Synchronize LED Screen, Lighting & Sound with Timecode | Road To The Star Season 5 | AEON II
4 953 просмотра · 2 мес. назад
LED EVENTS
23 подписчика
4 953 просмотра · 2 мес. назад
🎬 Behind every professional concert is perfect synchronization.
Watch how LED EVENTS delivers a fully synchronized live show using Timecode, integrating:
✅ LED Screen Content
✅ Lighting Programming
✅ Professional Sound System
✅ Show Control Automation
✅ Live Event Production
This project was produced for:
📍 Road To The Star Season 5
📍 AEON Mall Sen Sok City
📅 27 June 2026
Our technical team programmed every lighting cue, LED visual, and audio playback to run with frame-accurate precision, creating a seamless audience experience.
If you’re planning a:
• Concert
• Product Launch
• Music Festival
• Corporate Event
• TV Production
• Live Show
LED EVENTS provides complete event production solutions across Cambodia.
🎥 Services
• LED Screen Rental
• Stage Design & Production
• Lighting Design & Programming
• Professional Sound System
• Timecode Programming
• Show Control System
• Truss & Rigging
• Special Effects (CO₂, Sparkular, Flame, Laser)
• Event Technical Management
🌐 Website
https://www.ledevents.asia (https://www.ledevents.asia/)
📧 Email
info@ledevents.asia
📍 Phnom Penh, Cambodia
⭐ Why Timecode?
Timecode allows lighting, LED visuals, sound, and special effects to play in perfect synchronization, delivering a world-class production with maximum accuracy and reliability.
Keywords (put at the bottom)
#LEDEvents #Timecode #ShowControl #LEDScreen #LightingDesign #ConcertProduction #EventProduction #StageProduction #LiveEvent #Cambodia #LightingProgrammer #RoadToTheStar #AEONMall #LEDWall #ProfessionalLighting #SoundSystem #GrandMA3 #Resolume #LiveShow #ConcertLighting