Doha Metro Rail കുറഞ്ഞ നിരക്കിൽ ഒരു യാത്ര സൗകര്യം | #vronevlog|#malayalam |#dohametro |#travelqatar
VR One Vlog
0:00 / 0:00
Doha Metro Rail കുറഞ്ഞ നിരക്കിൽ ഒരു യാത്ര സൗകര്യം | #vronevlog|#malayalam |#dohametro |#travelqatar
2 011 просмотров · 6 лет назад
VR One Vlog
1,62 тыс. подписчиков
2 011 просмотров · 6 лет назад
Camera Credit goes to Abhilash MB.
#vronevlog
#dohametro
#qatar
#malayalam
#travelvlog
#metroinformation
#routedetails
Owner Qatar Rail logo.svg Qatar Rail
Area served Al Wakra, Doha, Al Qassar
Locale Doha
Transit type Rapid transit
Number of lines 3
Number of stations 37
Headquarters Doha
Website Qatar Rail
Operation
Began operation 8 May 2019
Operator(s) RKH Qitarat
(Hamad/Keolis-RATP Dev)[1]
Train length 3
Headway 5 minutes
Technical
System length 76 km (47 mi) (operational)
48.1 km (29.9 mi) (planned)
Track gauge 1,435 mm (4 ft 8 1⁄2 in) Standard gauge
Average speed 80-100 km/h
Top speed 100 km/h.
Line Inaugural date Length Stations Termini Status
Red Line 8 May 2019 (Al Qassar to Al Wakra)
10 December 2019 (Hamad International Airport, Katara, Qatar University and Lusail)
40 km 18 Lusail
Hamad International Airport
Al Wakra All stations except Legtalifiya Station are fully operational, which is expected to open April-June 2020.[12]
Green Line 10 December 2019[13] 22 km 11 Al Riffa
Al Mansoura Fully operational.[14]
Gold Line 21 November 2019[15][16] 14 km 11 Al Azizyah
Ras Bu Aboud Fully operational.
TOTAL: 76 km 37
The Doha Metro is a rapid transit system in Doha, Qatar's capital city, that became operational on 8 May 2019.[2] It has three lines with an approximate overall length of 76 km and 37 stations. It is an integral component of the larger Qatar Rail network, which will include a long-distance rail for passengers and freight, linking Qatar to the GCC, and the Lusail LRT. Capable of reaching 100 km/h, the Doha Metro will be one of the fastest driverless trains in the world.[3]
Doha Metro is operated and maintained for a duration of 20 years by RKH Qitarat, a joint venture formed by Hamad Group (51%) and French transit operators Keolis and RATP Dev (49%), on behalf of system owner Qatar Rail.[1]
[17:36, 1/22/2020] Vipin: The Doha Metro consists of three lines opening in phases from 2019-2020,[10] with an eventual completion date of 2026.[11] The Red, Green and Gold Lines radiate out from a central interchange at Msheireb in Downtown Doha.[11]
[17:37, 1/22/2020] Vipin: This would be updated when Qatar Rail has announced the stations for the next phase. This phase contains Blue Line. This would probably be announced in the end of 2020. This project is estimated to finish in 2025/6.