Can an offshore slug catcher survive multi-tonne liquid slugs surging uphill during a cold restart?
Offshore Engineering Academy
0:00 / 0:00
Can an offshore slug catcher survive multi-tonne liquid slugs surging uphill during a cold restart?
9 просмотров · 6 дней назад
Offshore Engineering Academy
196 подписчиков
9 просмотров · 6 дней назад
What happens when an unplanned compressor trip traps high-pressure, CO2-rich gas inside 150km of subsea pipeline in the deep Arafura Sea?
Can an offshore slug catcher survive multi-tonne liquid slugs surging uphill during a cold restart?
Worley completed FEEDs for two offshore packages on the $21B Abadi LNG and CCS megaproject in Indonesia’s Masela Block.
Operated by Inpex with Pertamina and Petronas, this project features a 9.5 MTPA FPSO tied to 150km of SURF, dual export lines, and dedicated deepwater CO2 re-injection pipelines.
Drafting subsea layouts in Jakarta, Singapore, and Perth is world-class work. But in 30 years of offshore commissioning, co-locating mega-scale LNG with deepwater CCS is an extreme flow assurance tightrope.
🚀 *The Abadi Blueprint:*
🌊 *Masela Block, Arafura Sea:* $21B integrated gas and carbon hub.
🌐 *150km SURF Network:* Dual gas export lines plus dedicated CCS links.
⚡ *9.5 MTPA FPSO:* Massive floating production with reservoir CO2 re-injection.
🚢 *Regional Engineering:* Executed by Worley’s Subsea Centers of Excellence.
⚠️ *The Multiphase & Hydrate Pitfall:*
Raw Abadi reservoir gas carries high CO2 under high pressure, creating severe operational risks:
🧊 *Thermal Cooldown & Hydrates:* Unplanned trips cause rapid heat loss to cold seabed water, plunging gas into the solid hydrate envelope.
💥 *Multi-Tonne Slugs:* Condensation drops out across 150km of seabed. Restarting risks launching massive liquid slugs that overwhelm topside slug catchers.
🛡️ *Dynamic HIPPS & Choke Control:* Preventing trips requires High-Integrity Pressure Protection Systems (HIPPS), predictive anti-slug chokes, and closed-loop MEG dosing.
🔍 *The Reality Check:*
Engineering centers draft the layout, but synchronized flow assurance automation keeps mega-floaters online. You cannot commoditize deepwater multiphase kinetics.
💬 *Let’s Debate:*
To Flow Assurance Leads, Subsea Engineers, and Commissioning Managers:
🔹 When restarting a 150km high-CO2 line, do you rely on predictive slug suppression or subsea choke throttling?
🔹 How do you verify dynamic HIPPS response times over long subsea umbilical distances?
Drop your perspectives below. 👇
📌 Download Pre-Commissioning & P&ID Guidelines:
[https://sumbit-infographics.netlify.app/](https://sumbit-infographics.netlify.a...)
🔔 SUBSCRIBE for complete engineering masterclasses:
[ / @offshoreengineeringacademy ]( / @offshoreengineeringacademy )
🌐 Visit SgMarineHub:
[https://sgmarinehub.com/](https://sgmarinehub.com/?utm_source=g...)
#OffshoreEngineering #AbadiLNG #Inpex #Worley #MaselaBlock #CarbonCapture #CCS #SubseaEngineering #FlowAssurance #FPSO #ProcessSafety #Commissioning