ISRR rolls the loaded Bear Run-Edwardsport 'Duke Energy' CBRED quickly through Linton, IN. 9/16/26
James Greenwood
0:00 / 0:00
ISRR rolls the loaded Bear Run-Edwardsport 'Duke Energy' CBRED quickly through Linton, IN. 9/16/26
65 просмотров · 9 дней назад
James Greenwood
311 подписчиков
65 просмотров · 9 дней назад
After about 2 hours worth of waiting, we began making preparations to film the northbound trip of the SAHW/HWSA trains that run 6 days a week unless otherwise scheduled.
While killing off a little time waiting, I walked over between the two lines and tried listening to see what, if anything I could hear yet.. glad I did too!
I barely made out the faint sound of the horns blowing announcing that this coal train was nearby, and was not wasting much time getting into town either.
Being without camera or tripod, I quickly made moves back across to where everything was staged and grabbed my gear, by which this time it had become a race to see whether or not I still had the ability to go get it like I had once upon a time!
Well, without incident or injury, and oddly enough time to spare I ended up getting things lined up and ready to roll.
#train #railway #indianasouthernrailroad #ISRR #GWRR #GeneseeWyoming #coal #coaltrain #peabody #duke #friendsofcoal #coalkeepsthelightson