Перейти к содержимому

Living under the Curve | afternoon synopsis of present work on Tuesday October 26th 2026

Livingunderthecurve

0:00 / 0:00

Living under the Curve | afternoon synopsis of present work on Tuesday October 26th 2026

7 просмотров · 8 дн. назад
Livingunderthecurve
6 подписчиков
7 просмотров · 8 дн. назад
Hey it’s Living Under the curve and I want to preface this by saying gay I was slightly annoyed that u had to refilm this video. But the work goes on. It is moving in the right direction with very little setbacks outside of inclement weather conditions that delay the workmen from being able to do their jobs. The back wall looks amazing l. The interior renovations are underway with both plumbing an electrical systems being installed. The front wall will have the railings installed before the end of the week. The back room will need to be dug up as well as the washroom. The noise levels are the testing factor. But luckily they are for short periods of time. This isn’t an easy phenomenon. We are 28!days in and well on the way to a newer modern looking home 🤗😊