Job Order Costing. CPA exam. Managerial/Cost Accounting.
Farhat Lectures. The # 1 CPA & Accounting Courses
0:00 / 0:00
Job Order Costing. CPA exam. Managerial/Cost Accounting.
3 302 просмотра · 4 года назад
Farhat Lectures. The # 1 CPA & Accounting Courses
283 тыс. подписчиков
3 302 просмотра · 4 года назад
What is job order costing and how do you allocate manufacturing overhead? This video introduces job order costing (job costing), the managerial accounting method used to track costs for unique, customized products rather than mass-produced goods. Professor Farhat explains the job cost record, how to trace direct materials and direct labor to a job, why manufacturing overhead must be applied using a predetermined overhead rate, and works a full costing example step by step — a core cost accounting topic tested under the BAR discipline for CPA and CMA candidates and accounting students.
Try it free at farhatlectures.com — interactive exercises, lectures, simulations, cases, multiple choice, and AI tools for CPA, CMA, EA and students.
Video Timeline & Key Concepts:
0:00 — Introduction to job order costing
3:01 — Industries that use job costing for individualized products
5:17 — The job cost record
6:46 — Tracing direct materials and direct labor to a job
9:20 — Applying manufacturing overhead, the hardest cost to trace
11:49 — Calculating the predetermined overhead rate
15:08 — Full job costing example from start to finish
Frequently Asked Questions:
What is job order costing?
Job order costing is a system that accumulates production costs by individual job or batch, used when products are customized or unique rather than identical and mass-produced.
What are the three product cost components in job costing?
The three components are direct materials, direct labor, and manufacturing overhead, which together make up the total cost of a job.
Why is manufacturing overhead applied using a predetermined rate?
Because overhead cannot be traced directly to a job and actual amounts are not known until later, so a predetermined rate lets companies apply overhead throughout the period.
How do you calculate the predetermined overhead rate?
Divide the estimated total manufacturing overhead by the estimated total allocation base, such as direct labor hours or machine hours, before the period begins.
When would a company use job costing instead of process costing?
A company uses job costing for distinct, customized jobs like construction or custom orders, and process costing when identical units flow continuously through production.
#CPAexam #CMAexam #enrolledagentexam #accountingcourses #collegecourses #courses #BAR #managerialaccounting #jobordercosting #manufacturingoverhead #costaccounting #ProfessorFarhat #accountingstudents