Pipeline Webinar Series Episode 8: Criss-Crossing the Capital Beltway
GeoEngineers Inc.
0:00 / 0:00
Pipeline Webinar Series Episode 8: Criss-Crossing the Capital Beltway
236 просмотров · 3 г. назад
GeoEngineers Inc.
187 подписчиков
236 просмотров · 3 г. назад
Recorded: June 13, 2023
Presenter: Gary Castleberry, MS, Senior Construction Consultant
Special Guests: Matthew Rudd (Dominion Energy) and Tucker Toelke (Michels Corporation)
Moderator: Jon Robison, PE, Principal Engineer/Pipelines Discipline Leader
Jon Robison, Gary Castleberry, and representatives from Dominion Energy (owner) and Michels Corporation (contractor) discuss a recent project where the Direct Pipe® trenchless installation method was selected for a 230kV electrical transmission line installation beneath I-66, I-495, and the Washington Metropolitan Area Transit Authority railroad in Fairfax County, Virginia. The presenters share insights on how the Direct Pipe® method reduced the risk of inadvertent drilling fluid returns and settlement to the overlying highway and bridge infrastructure.