Jumbo Resin Bolting. 23 resin bolts installed in 33 Minutes
Wilco Technologies
0:00 / 0:00
Jumbo Resin Bolting. 23 resin bolts installed in 33 Minutes
833 просмотра · 2 года назад
Wilco Technologies
35 подписчиков
833 просмотра · 2 года назад
Contract Underground Mining- Jumbo Operator installing 23 Resin Bolts in 33 minutes using the Trajectaflex Resin Firing System.
Drill and install as you go sequence.
The Resin Loading Manifold is installed on the LHS accessed by offsider. Trajectafelx Nozzle is installed on the RH Boom.