Перейти к содержимому

Installation and initial start up - VENTUS Compact air handling unit, floor mounted ver. with RRG

VTS Group

0:00 / 0:00

Installation and initial start up - VENTUS Compact air handling unit, floor mounted ver. with RRG

2 515 просмотров · 3 года назад
VTS Group
5,94 тыс. подписчиков
2 515 просмотров · 3 года назад
Table of Contents: 1. 00:06 - 00:12 - Introduction 2. 00:13 - 00:19 - Table of contents 3. 00:20 - 00:36 – Shipping and packaging methods of the air handling unit 4. 00:37 - 00:52 – Checking the completeness of the delivery with the order 5. 00:53 - 01:02 – Unpacking and presentation of the ordered air handling unit 6. 01:03 - 01:11 – Tools needed to assemble the air handling unit 7. 01:12 - 01:36 – Downloading technical documentation 8. 01:37 - 01:51 – Positioning the main section in it’s final location 9. 01:52 - 02:21 – Connecting optional modules with the main section 10. 02:22 - 02:26 – Connecting the fire alarm 11. 02:27 - 02:41 – Connecting the supply air temperature sensor 12. 02:42 - 02:58 – Connection of the antifreeze thermostat of the water re-heater 13. 02:59 - 03:08 – Installation of the heating medium return temperature sensor on the medium outlet connector 14. 03:09 - 03:21 – Connection of the heating medium return temperature sensor 15. 03:22 - 03:48 – Connecting the signal controlling the control valve of the water re-heater 16. 03:49 - 04:26 – Connection of the alarm signal and 0-10V control signal of DxH cooler/heater supply unit 17. 04:27 - 04:38 – Connection of the signal for switching the HEATING/COOLING mode of the unit supplying the DxH cooler/heater and the START/STOP signal 18. 04:39 - 05:01 – Connecting the control of the HMI Basic operator panel 19. 05:02 - 05:05 – Completion of connection of controls components 20. 05:06 - 05:56 – Connecting the power cable for the water re-heater 21. 05:57 - 06:13 – Connecting the main unit power cable 22. 06:14 – Connecting to the power mains 23. 06:15 - 06:36 – Checking the correctness of the voltage between the phases of the main switch. 24. 06:37 - 08:16 – Commissioning the AHU using the physical HMI Advanced 25. 08:17 - 09:27 - Commissioning the AHU using the mHMI application 26. 09:28 - 13:24 - Commissioning the AHU using the built-in visualisation 27. 13:25 - 17:20 - Commissioning the AHU using the virtual HMI Advanced controller (WEB HMI)