Перейти к содержимому

When will Mira.Bhayander Metro open| Mumbai Metro 9 phase 2 update

Santy's Vlogs

0:00 / 0:00

When will Mira.Bhayander Metro open| Mumbai Metro 9 phase 2 update

9 418 просмотров · 5 дн. назад
Santy's Vlogs
4,07 тыс. подписчиков
9 418 просмотров · 5 дн. назад
Mumbai Metro Line 9 is a 13.581 km extension of Metro Line 7, connecting Dahisar (East) and Mira-Bhayandar to the airport. Key Project Details • Total Length: 13.581 km (11.386 km elevated and 2.195 km underground) • Total Stations: 10 stations • Owner & Operator: Mumbai Metropolitan Region Development Authority (MMRDA) • Project Base Cost: ₹6,607 Crore • Rolling Stock: 8-coach trains with a capacity of 2,352 passengers Route and Stations The full line covers the following stations: • Dahisar (East) to Mira-Bhayandar (Elevated): 1. Dahisar 2. Pandhurang Wadi 3. Miragaon 4. Kashigaon 5. Sai Baba Nagar 6. Meditiya Nagar 7. Shahid Bhagat Singh Garden (Maxus Mall) 8. Subhash Chandra Bose Stadium • Andheri (East) to CSIA Extension: 1. Airport Colony (Elevated) 2. CSIA (Underground) Operational Status & Timeline • Phase I (Dahisar East to Kashigaon): Opened to the public on April 7, 2026 (covering ~4.7 km with 4 stations) via the MMRDA Metro Line 9 Overview. • Phase II (Kashigaon to Subhash Chandra Bose Stadium): Expected to be completed and inspected by the CMRS around December 2026. • Interchanges: Connects with Metro Line 7 (Red Line) and Metro Line 2A at Dahisar East, providing direct access towards Gundavali (Andheri East) and the wider Mumbai suburban network.