MZCR (Multi-Zone Circulating Reactor) Erection and Installation Study
The site erection and installation of MZCR (R4230, Multi-Zone Circulating Reactor) could be more complicated than the other static equipment, thus Module Solution Team has performed the constructability study at the construction planning stage.
MZCR Structure erected before equipment site arrival!!
The steel erection will be faster than the equipment will arrive at the site, Reactor should be erected through grating open’g.
(Vertical type Equipment : Installation through a open’g in the grating, Horizontal type Equipment : Side erection)