Перейти к содержимому

[Swapped out from PM LN] KSF CSR C151B 649/650 [Dhoby Ghaut 》 Novena]

KKS C151 Fapper

0:00 / 0:00

[Swapped out from PM LN] KSF CSR C151B 649/650 [Dhoby Ghaut 》 Novena]

1 785 просмотров · 4 недели назад
KKS C151 Fapper
300 подписчиков
1 785 просмотров · 4 недели назад
TRN: 256 [BSD 》 UPD] 》 227 [BSD 》 BSD] Manufacturer: Kawasaki Heavy Industries Ltd. & CSR Qingdao Sifang Co. Ltd. Year Built: 2016 Year Debuted: 2017 Year Retrofitted: 2025 Traction Motor: IGBT - VVVF (CRRC Times Electric) Line: North-South Line Destination: Jurong East [A] (4) Recorded: 30th July 2026 Recorded at: 1649 A1 After messing around with 877, I went up the NSL platform at BSH to see that 649/650 had already departed. I quickly boarded the original 227 which was 947/948 up until MSP where both trains swapped slots meaning 947/948 was now 256 and 649/650 was now 227. Since it swapped to 227, it would not be running until late night during to 227 withdrawing at AMK 4 right after turning back from JUR 5. I then rode 649/650 up until the point of withdrawal at AMK 4. Trips done: BSD TB3 - BSH W - MSP 2 -MSP 1 (SWAP) - JUR 5 - AMK 4 - BSD TB1 Footage solely recorded by googoogaagaa productions