Перейти к содержимому

TRAVERSE SURVEY BY TOTAL STATION (PART- 01).

Civil Technology

0:00 / 0:00

TRAVERSE SURVEY BY TOTAL STATION (PART- 01).

17 738 просмотров · 2 года назад
Civil Technology
1,98 тыс. подписчиков
17 738 просмотров · 2 года назад
TRAVERSE SURVEY BY TOTAL STATION. In compass surveying which involves a series of connected survey line is known is traversing. TYPES OF TRAVERSE. Close Traverse a series of connected line from a close circuit. the finishing point coincides with strating point of surveysurvey it's called Close Traverse. OPEN TRAVERSE. a sequence of connected line extend along a general direction and doesn't return to the starting points it's known is open traverse.    • HOW TO USE DATA FUNCTION IN TOTAL STATION....      • EDM & CONFIGURATION BASIC SETTING OF TOPCO...      • BACKSIGHT WITH ANGLE BY TOTAL STATION. (On...      • How To Use S.O Function / Mark Center Line...      • ASSUME COORDINATE.  Set Arbitrary/Local Co...  .