Перейти к содержимому

ITC-SA Erecting a Hip

Institute for Timber Construction South Africa

0:00 / 0:00

ITC-SA Erecting a Hip

27 576 просмотров · 8 л. назад
Institute for Timber Construction South Africa
469 подписчиков
27 576 просмотров · 8 л. назад
Part 5 of the ITC-SA Roof Erection Training DVD Setting out the hip (introduction) 0:06 Connecting of multiply trusses together 0:44 Installing the1st truncated hip girder & attaching hangers, making the provision for torsional strap 2:38 Trimming of the supported trusses to the correct bottom chord lengths & attaching of the torsional 4:43 Installing the supported trusses on the truncated girder truss & attaching the torsional strap to the girder truss 5:01 Plumbing and temporary bracing of hip trusses 6:11 Erection of the 2nd hip 6:29 Installing hangers and heavy duty cleats 7:04 Chamfering the centre jack trusses for clearance of the weld on the cleat & installing jack trusses 7:24 Cutting and attaching extended rafters of jack trusses 8:05 Marking the position of the hip rafter of the hip girder truss and checking the level of the hip trusses 8:40 Installation of torsional strap at the heavy duty cleat 10:32 Installation of 45 deg jack trusses 10:46 Connection of the jack truss fly rafter to the flat horizontal top chord of the truncated girder truss 11:11 Installation of strap around the end verticals of the jack trusses and centre web of the truncated girder truss 11:43