Перейти к содержимому

HS2 Old Oak Common Construction Update (Sep 2026) | 伦敦老橡树HS2交通枢纽建设进展 (2026年9月)

Edwin Shi

0:00 / 0:00

HS2 Old Oak Common Construction Update (Sep 2026) | 伦敦老橡树HS2交通枢纽建设进展 (2026年9月)

2 526 просмотров · 1 день назад
Edwin Shi
43 подписчика
2 526 просмотров · 1 день назад
Filmed on September 29, 2026. I almost missed the September deadline, but if you need an excuse, I was holding out for the official release of the West London Orbital (WLO) consultation! 🤣 It has been a busy few weeks with several major news announcements regarding Old Oak Common: First, in mid-August, HS2 Ltd officially announced the structural completion of the six 450-metre-long underground high-speed platforms. Moving forward, the focus will shift towards Mechanical and Electrical (M&E) installations and advancing the above-ground works. You can read more here: https://mediacentre.hs2.org.uk/news/h... Second, on September 23, Transport for London (TfL) officially launched the public consultation and business case for the West London Orbital (WLO). The proposed Old Oak Common Lane station will be situated in the triangular plot between the North London Line and the Dudding Hill Line. The WLO will undoubtedly boost wider connectivity across West London. Furthermore, this same plot is planned to host an east-west pedestrian bridge, which is crucial for accessibility to the HS2 Old Oak Common station. Early planning approvals will help avoid duplicated construction efforts in the future. Have your say here: https://haveyoursay.tfl.gov.uk/west-l... Finally, on September 29, HS2 Ltd, Network Rail, TfL, and the Department for Transport announced a landmark agreement: by optimising and lowering the track bed design for the conventional platforms (Platforms 5 to 8), level boarding will be successfully achieved for all Elizabeth Line services stopping at the Old Oak Common superhub. Read the details here: https://mediacentre.hs2.org.uk/news/l... Back on site, here are the key updates from across the construction zones in this month's footage: 1. Old Oak Common Main Site (Main Station Box Area) With the underground high-speed platforms structurally complete, surface construction forces have been visibly strengthened. Most notably, earthworks and land levelling are progressing rapidly on both the eastern and western sides of the conventional platforms, laying the groundwork for the eventual integration with the Great Western Main Line (GWML) tracks. 2. Victoria Road Crossover Box & Tunnelling Logistics As the Tunnel Boring Machines (TBMs) advance, the engineering team is continuously feeding precast concrete tunnel segments and track materials through this crossover box to support the ongoing tunnelling efforts towards London Euston. 3. Willesden Euroterminal Excavators are working around the clock to load massive quantities of excavated tunnel spoil onto freight trains. Meanwhile, precast tunnel segments arrive directly by rail from County Durham. These are then transferred onto heavy trailers, transported through the logistics tunnel to the Crossover Box area, and eventually lowered for assembly. If you enjoy monthly aerial updates on this mega infrastructure project, feel free to like, comment, and subscribe. See you next month for the next update on Old Oak Common.👍 Click the links below to check out more exciting HS2 drone updates from other YouTubers I recommend:    / @jmpsmedia      / @birdseyeviewinfastructure   本期视频拍摄于9月29日(差点就错过了9月的更新,如果您需要一个借口的话,那是因为我一直在等待 West London Orbital 公众咨询文件的正式发布🤣)。最近几周,关于 Old Oak Common 的重磅新闻可谓接连不断: 首先,HS2 有限公司在8月中旬正式宣布,Old Oak Common 车站地下层 6 座 450 米长的高铁站台结构已全面完工。接下来的工程重点将转向机电设备的安装,并全面推进地面以上的建设。相关内容可参考: https://mediacentre.hs2.org.uk/news/h... 其次,伦敦交通局(TfL)于9月23日正式发布了西伦敦轨道交通(West London Orbital, WLO)的公众咨询文件及商业可行性报告。计划中的 Old Oak Common Lane 车站将设于北伦敦线(North London Line)与 Dudding Hill 线交汇的三角地带。WLO 无疑将极大地增强西伦敦区域的交通连通性。值得一提的是,该车站所在的同一地块还规划了一座东西向的人行天桥,这对未来 HS2 Old Oak Common 站的通达性至关重要。尽早完成规划审批,将有助于避免未来的重复建设。相关内容可参考: https://haveyoursay.tfl.gov.uk/west-l... 最后,就在9月29日,HS2 有限公司、英国铁路网公司(Network Rail)、伦敦交通局(TfL)及英国交通部联合宣布了一项新协议:通过优化并降低常规站台(5至8号站台)的轨道铺设高度,伊丽莎白线(Elizabeth Line)列车在 Old Oak Common 站将全面实现无高差的平坦登车(Level Boarding)。相关内容可参考: https://mediacentre.hs2.org.uk/news/l... 回到现场,以下是本期航拍中,站区各关键施工区域的最新进展: 1. Old Oak Common Main Site(主站区域) 随着地下高铁站台结构的基本完工,地面工程的施工力量正得到进一步加强。特别值得注意的是常规站台东、西两侧的土地平整作业,这些都是为未来接入大西部干线(GWML)并铺设铁轨打下基础。 2. Victoria Road Crossover Box(渡线箱体)及隧道物流 随着隧道掘进机(TBM)的不断推进,工程团队正通过该区域,源源不断地将预制好的隧道管片及轨道物料输送至地下,支援通往 Euston 的隧道掘进工作。 3. Willesden Euroterminal 在这里,挖掘机日以继夜地将隧道掘进产生的土方装上货运列车运走。同时,预制好的隧道管片通过铁路从达勒姆郡(County Durham)直接运抵此地,随后由重型拖车送入物流隧道,运往渡线箱体区域进行最终的吊装与拼接。 如果你喜欢这类英国超级工程的月度航拍更新,欢迎点赞、评论与订阅,我们下个月继续跟进 Old Oak Common 的最新进展。👍 点击以下链接查看来自我推荐youtuber的更多精彩 hs2 航拍更新:    / @jmpsmedia      / @birdseyeviewinfastructure