Перейти к содержимому

Strengthening 64-Year-Old Saraighat Bridge | North East Frontier Railway

KapDX Documentaries

0:00 / 0:00

Strengthening 64-Year-Old Saraighat Bridge | North East Frontier Railway

23 662 просмотра · 11 дней назад
KapDX Documentaries
1,15 тыс. подписчиков
23 662 просмотра · 11 дней назад
Across the Brahmaputra, Saraighat Bridge connects more than two riverbanks. It connects communities, journeys, and the everyday life of a region. This Documentary follows the strengthening and rehabilitation of the Saraighat Rail-cum-Road Bridge by North East Frontier Railway. It traces the response to ageing, prolonged monsoon exposure, corrosion, and concrete deterioration—from investigation and planning to the repair work and final inspection. Go inside the major engineering processes: localised deck-slab repairs, cross-girder strengthening with steel angles and cover plates, replacement of expansion joints with strip-seal assemblies, and strengthening and sealing of construction joints. The film also documents concrete testing, surface preparation, bonding, placement and curing, followed by bituminous paving, mastic asphalt waterproofing, anti-skid finishing and protective painting. Behind each stage are the Railway engineers, site teams and construction agencies working through the details that make rehabilitation possible. Site safety, careful alignment, connection checks, survey verification and inspection form part of this story of preserving an important regional lifeline. CHAPTERS 00:00 Saraighat Bridge, A Regional Lifeline 00:34 Ageing, Monsoon Exposure and Deterioration 01:00 Planning and Review by the GM and PCE 01:17 The PCE’s Perspective 01:42 Investigation and Planning the Rehabilitation 02:42 Site Preparation, Safety and Concrete Testing 03:12 Localised Repairs and Cross-Girder Strengthening 03:37 Reinforcement, Concrete Placement and Curing 04:12 Moving into Bridge-Wide Rehabilitation 05:06 Expansion-Joint Replacement 05:53 Construction-Joint Strengthening 07:45 Bituminous Concrete Paving 08:05 Mastic Asphalt Waterproofing and Anti-Skid Finishing 08:46 Survey Verification and Protective Painting 09:15 Final Inspection and the GM’s Message 09:54 Preserving a Lifeline for Future Generations CONSTRUCTION AGENCIES • Jyoti Forge & Fabrication • M/S Phanindra Kumar Baishya • Eureka Construction A FILM BY KapDX Media FILM CREDITS Written & Directed by: Pompi Borah Director of Photography: Arjun Tumung Lead Editor: Kapil Das Motion Graphics & VFX: Badanya Kalita, Nibir Abeg Kalita Music Selection, Sound Design & SFX: Dhriti Barman Aerial Cinematography: Pranjit Das, Gajen Boro Assistant Cinematographer: M Sushma Singha Lighting & Gaffers: M Sushma Singha, Dhriti Barman Makeup Artist: Dhriti Barman “Engineering is not merely the construction of structures. It is the preservation of a nation’s lifelines.” #SaraighatBridge #NorthEastFrontierRailway #BridgeRehabilitation #IndianRailways #CivilEngineering