Перейти к содержимому

BIHOR | Inel Rutier Metropolitan Oradea -- LOT 2 | 26.04.2025

The Flying Cat

0:00 / 0:00

BIHOR | Inel Rutier Metropolitan Oradea -- LOT 2 | 26.04.2025

5 374 просмотра · 1 год назад
The Flying Cat
1,65 тыс. подписчиков
5 374 просмотра · 1 год назад
BIHOR | Inel Rutier Metropolitan Oradea -- LOT 2 | 26.04.2025 BIHOR | Oradea Metropolitan Ring Road -- LOT 2 | 26.04.2025 #bihor #oradea #osorhei #bailefelix #project #centura #construction #ringroad #roadconstruction #droneromania #dronefootage #infrastructure #megaprojects ROMANIAN 📍 Progresul lucrarilor la Inelul Rutier Metropolitan Oradea, Lotul 2, filmat pe 26 aprilie 2025. Imagini aeriene ale santierului intre Osorhei si Baile Felix. ENGLISH 📍 Construction progress on the Oradea Metropolitan Ring Road, Lot 2, filmed on April 26, 2025. Drone footage showing the site between Osorhei and Baile Felix. SUMAR RO 📚 Proiect: Constructie: Inel Metropolitan Oradea ▶️ Detalii proiect (Romanian): Inelul rutier va avea 17 km lungime, cu cate o banda pe sens. Doua loturi: Lot 1 (9 km – finalizat) si Lot 2 (8 km – in executie). Finanțare prin Programul Național "Anghel Saligny". Asociatia de Dezvoltare Intercomunitara: CJ Bihor + Primaria Oradea. Colaborare: Osorhei, Sanmartin, Nojorid. 💰 Valoarea investitiei: LOT 1: finalizat -- 70.143.942,59 lei, fara TVA (termen 24 luni; semnat 17.07.2024) LOT 2: in derulare -- 81.688.374,45 lei, fara TVA (termen 18 luni; semnat 14.04.2024) 🏗 Constructori: LOT 1: finalizat S.C. ASFAMIXT S.R.L S.C. OPR ASFALT S.R.L. S.C. DACIA FABER S.R.L LOT 2: 85% (in derulare) SC PORR CONSTRUCT SA EN SUMMARY 📚 Project: Construction: Oradea Metropolitan Ring Road ▶️ Project details: The metropolitan ring road will be 17 km long, one lane per direction. Two sections: Lot 1 (9 km – completed) and Lot 2 (8 km – under construction). Funded through Romania's "Anghel Saligny" national program. Developed jointly by Bihor County Council and Oradea City Hall. Cooperation with nearby communes: Osorhei, Sanmartin, and Nojorid. 💰 Project Value: Lot 1 (completed): 70,143,942.59 lei (no VAT) – signed 17.07.2024 Lot 2 (ongoing): 81,688,374.45 lei (no VAT) – signed 14.04.2024 🏗 Contractors: LOT 1: finalized S.C. ASFAMIXT S.R.L S.C. OPR ASFALT S.R.L. S.C. DACIA FABER S.R.L LOT 2: 85% (completion) SC PORR CONSTRUCT SA 🔗 Surse utile / Useful links: Traseul Inelului Rutier Metropolitan (Route Map) https://www.cjbihor.ro/traseul-inelul... Lucrari pe Lotul 2 (Work Progress) https://www.cjbihor.ro/lucrari-pe-lot...