Перейти к содержимому

20FT Flexitank with Iron Tube Heating Pad – Full Installation, Loading & Unloading Process

Qingdao LET Flexitank Technology Co., Ltd.

0:00 / 0:00

20FT Flexitank with Iron Tube Heating Pad – Full Installation, Loading & Unloading Process

79 просмотров · 1 месяц назад
Qingdao LET Flexitank Technology Co., Ltd.
113 подписчиков
79 просмотров · 1 месяц назад
This video demonstrates the complete process of installing a 20FT flexitank with an iron tube (steel pipe) heating pad, covering pad placement, container preparation, loading, and heated unloading. The iron tube heating pad consists of galvanized steel pipes at each end connected by high-temperature rubber hoses, running the full length of the container. Steam or hot water flows through the pipes, transferring heat to the flexitank from below to liquefy solidified cargo before discharge. This solution is specifically designed for products that require higher temperatures to melt, such as certain oils, fats, and high-viscosity chemicals. Key steps shown in this video: Pad placement – Lay the iron tube heating pad on the container floor Flexitank installation – Install the flexitank above the heating pad Loading – Fill the liquid cargo Heating before unloading – Connect steam supply, allow sufficient heating time Unloading – Discharge the heated, flowable cargo Key advantages: Iron pipes and high-temperature rubber hoses withstand extreme temperatures Simple structure with high thermal efficiency No damage to the flexitank during operation Reusable (inspect and repair before each reuse) 📌 Always check the melting temperature of your product to avoid overheating. Keep the heat source connected until about 1/4 of the product remains, then gradually reduce pressure. 🔔 Subscribe for more flexitank operation guides! #Flexitank #IronTubeHeatingPad #SteelPipeHeating #ContainerLoading #BulkLiquidTransport