S2 E4 The Rebuild Begins at Bexhill West Model Railway
Bexhill West
0:00 / 0:00
S2 E4 The Rebuild Begins at Bexhill West Model Railway
3 195 просмотров · 5 лет назад
Bexhill West
7,3 тыс. подписчиков
3 195 просмотров · 5 лет назад
In this video, I outline the new baseboard arrangements which have been designed with the change in gauge to P4 in mind. I run through the layout of the first board and show how the elements from the previous arrangement will be incorporated.
Thanks for watching,
James