How Pakistan Railways Plans to Cut Lahore to Rawalpindi Travel Time in Half.Rawalpindi Double Track
Raz Uncle
0:00 / 0:00
How Pakistan Railways Plans to Cut Lahore to Rawalpindi Travel Time in Half.Rawalpindi Double Track
3 398 просмотров · 9 часов назад
Raz Uncle
31,6 тыс. подписчиков
3 398 просмотров · 9 часов назад
Detailed History: Lahore to Rawalpindi Railway Track (Main Line-1)
The Lahore–Rawalpindi section forms a vital, historic segment of Pakistan Railways’ Main Line 1 (ML-1), stretching roughly 290 km (180 miles) across the heart of Punjab and through the rugged terrain of the Potohar Plateau.
1. Origins & British Colonial Era (1860s–1880s)
Initial Development: Railway construction in the region began under the Scinde, Punjab & Delhi Railway company. The section from Lahore towards Gujranwala and Wazirabad opened in the early 1870s.
Strategic Expansion (1881–1883): Following the Second Anglo-Afghan War, British engineers prioritized connecting Lahore with Rawalpindi and Peshawar for strategic military mobility along the North-West Frontier. The line was consolidated under the state-run North Western State Railway (NWR) in 1886.
Engineering Feats: Crossing major rivers required monumental engineering:
Alexandra Bridge over the Chenab River near Wazirabad (opened 1876).
Major bridges spanning the Jhelum River and Soan River.
2. The Potohar & Salt Range Realignment (1980s)
The most challenging stretch of this route lies between Jhelum, Dina, Bakrala, Sohawa, and Gujar Khan, where the railway climbs through the jagged hills of the Salt Range and Potohar Plateau.
Historically, the single track suffered from steep gradients and sharp curves that severely restricted train speeds.
In the late 1970s and 1980s, Pakistan Railways constructed the Chak Amru / Dina–Sohawa realignment, adding high viaducts, deep cuttings, and tunnels to ease gradients and prepare the corridor for double-tracking and higher speeds.
3. Modern Era & Proposed Upgrades
While large sections south of Jhelum have been upgraded and doubled over the decades, the hilly terrain between Lalamusa/Jhelum and Rawalpindi has remained the primary bottleneck for express services.
Under modern modernization projects (including the ML-1 overhaul project), proposals have focused on full double-tracking, realignment, fencing, and advanced signaling to cut the Lahore–Rawalpindi journey time down to approximately 2.5 to 3 hours.
#LahoreToRawalpindi,#RawalpindiToLahore,#PakistanRailways,#MainLine1,#ML1,#ML1Project,#RailwayTrack,#DoubleTrack,#FastRoute,#RailwayDevelopment, #railway, #train, #travel,#RailwayInfrastructure,#RailwayBridges,#TrackDoubling,#SaltRange,